Site work and paving for a road / highway in Heflin, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of November 8, 2023, the project has been awarded, however, a timeline for construction has not been confirmed. The work under this Section covers the general requirements that are applicable to all types of hot and warm mix asphalt pavements of the plant mix type. Deviations from these general requirements will be indicated in the specific requirements for various types of mixes noted in the following sections of these Specifications. This work shall consist of one or more courses of hot and warm mix asphalt plant mix constructed in accordance with these specifications and the specific requirements of the type of mixture required and in reasonably close conformity with the lines, grades, thicknesses, and typical cross sections shown on the plans or established by the Engineer. The Contractor may use either hot mix or warm mix for all Super pave ESAL Range mixes in Sections 420, 423, and 424. Warm mix asphalt shall be defined as the use of an approved warm mix technology in the plant mix at the time of production. This work shall also include the preparation of the underlying surface on which the plant mix is to be placed, including patching and/or leveling as shown on the plans or directed by the Engineer. Cleburne County Contract Time: 175 Working Days For constructing the Clearing, Micro-Milling, Resurfacing (Open Graded Friction Course), and Traffic Stripe on I-20 from the SR-46 Overpass in Heflin to the Georgia State Line. Length 13.763 mi. The Bracket Estimate on this project is from $4,562,964 to $5,576,956 . If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 007 - Constructing the Clearing, Micro-milling, Resurfacing (Open Graded Friction Course), and Traffic Stripe on I-20 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$6,395,355.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 3, 2023
January 2, 2024
I-20, Heflin, AL
Related To This Project
Heflin, AL
Bid Date: Jan 04 2024
Annual In-Place Plant Mix Annual Bituminous Treatment Resurfacing Annual Traffic Striping, - 5496301
Heflin, AL
Bid Date: Aug 21 2024
Heflin, AL
--
Heflin, AL
--
Heflin, AL
Bid Date: Oct 17 2024
Heflin, AL
Bid Date: Nov 21 2024
Heflin, AL
Bid Date: Nov 05 2021
Heflin, AL
Bid Date: Aug 16 2023
Heflin, AL
Bid Date: Jun 02 2020
Heflin, AL
Bid Date: Mar 21 2023
Heflin, AL
Bid Date: Mar 15 2023
Heflin, AL
Bid Date: Mar 15 2023
Heflin, AL
Bid Date: Sep 27 2019
Heflin, AL
Bid Date: Jul 21 2021
Heflin, AL
Bid Date: Feb 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.