BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Boulder, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000332642 The City of Brighton seeks the bid of qualified firms to provide construction services for removal and replacement of a concrete weir structure. The project shall complete later than April 1, 2024, and before irrigation ditches fill. -The City anticipates project work to begin in early November 2023 Question Acceptance Deadline 10/18/2023 at 9:00 AM MT Questions are submitted online No Bonding Requirements - Performance Bond 100 % - Maintenance Bond 100 % - and Materials Bond 100 % - Payment Bond 100 % -- The Bidder shall be required to furnish a Performance and Payment Bond equal to one hundred percent (100%) of the amount of the contract, such Performance Bond to guarantee (a) the faithful performance and completion of the work in strict accordance with the terms of the Contract , A separate and Material Payment Bond in the amount of one hundred percent (100%) of the amount of the contract will be required which will insure the payments of laborers, material suppliers, and sub-bidders in connection with the work performed under the contract and it will satisfy requirements of the Colorado Revised Statutes , A separate Maintenance Bond in the amount of one hundred percent (100%) of the amount of the contract will be required which will insure the repair or replacement where requested by the City, or cost thereof, non-cancelable for a period of two (2) years after the issuance of the certificate of acceptance, of all work performed under the terms of the contract. he City of Brighton owns an existing weir measurement structure along Baseline Road. The existing structure is a 5-foot rectangular sharp-crested weir consisting of a fixed steel plate supported by 12-inch reinforced concrete walls extending into the ditch banks. The existing structure is substandard and requires modification to meet its intended purpose. The City intends to secure a Contractor to remove the existing structure and replace it with a concrete long-throated flume structure. The Work to be performed under this project shall consist of furnishing tools, equipment, materials, and supplies, in addition to furnishing labor, transportation, and performing all work other operations required for the fulfillment of the project t in accordance with the plans and specifications. The Work shall be complete; all work, materials, and services not expressly indicated or called out which may be necessary for the complete and proper construction of the Work in good faith shall be provided at no increase in cost to the City. The Work includes: the furnishing of all labor, materials, and equipment for the supply, delivery, fabrication, installation, testing, and other materials and services required for the Baseline Road Weir Outfall project. Specific features include, but are not limited to: 1. Site preparation. Ditch flows must be bypassed around active construction for the duration of the project. 2. Demolition and removal of the existing structure. 3. Sitework, grading, and foundation preparation. 4. Construction of new long-throated flume structure. 5. Flow recording and telemetry equipment. 6. Site restoration. 7. Surveying and testing

Bid Results

Water / Sewer

$157,455.00

Public - City

Site Work

12

4

2

5

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
35
Bidding Soon
923
All Active Projects
392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2023

November 4, 2023

img_map_placeholder

Baseline Rd, Boulder, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.