BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a power facility in Paramount, California. Completed plans call for the renovation of a 6,000-square-foot power facility.

**As of November 9th, 2023, this project has not yet been awarded. A timeline for the award has not yet been established.** Substation Flooring Replacement Project. Questions regarding the bid specifications should be directed to Mario Flores at (562) 220-2020 and/or at Mflores@paramountcity.com. The Contractor shall be responsible for the removal of the current carpet. The contractor will also be responsible for the installation of the new Substation flooring that is approximately 6,000 square feet. Contractor shall also install cove base in all affected areas (color to be determined by city staff). The contractor shall also provide an additional 200 square feet of carpet for in-house replacements. Work shall include the following: a. Carpet shall be; i. Purchased from; ShawContract ii. Style Name; Side By side iii. Style number; 5T452 iv. Color name; Merge v. Color number; 50518 vi. Collection; The collective vii. Construction; Multi- Level Pattern Loop viii. Fiber; EcoSolution Q100TM Nylon ix. Dye Method; 100% Solution Dyed x. Primary Backing; Synthetic xi. Secondary Backing; EcoWorx Tile xii. Protective Treatment; SSP Shaw soil Protection xiii. Warranty; Lifetime Commercial Limited xiv. Product Size; U.S- 18in x 36in xv. Gauge; U.S.- 1/10in xvi. Stitches; U.S.- 10 per inch xvii. Finished Pile Thickness; U.S.- 0.125in xviii. Average Density; U.S.- 6912 per cu.yd. xix. Tufted Weight; U.S.- 24.0 oz/yd2 2. Responsibility of the contactor to remove furniture to complete work and replace furniture back to its original corresponding locations once work has been completed. a. Contractor is responsible for any and all damages incurred by the removal and/or replacement of furniture.

Award

Power Plant

$69,499.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
108
Bidding Soon
2,312
All Active Projects
1,031
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

November 27, 2023

img_map_placeholder

15001 Paramount Blvd, Paramount, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.