BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Renovation of an educational facility in Raleigh, North Carolina. Conceptual plans call for the renovation of a educational facility.

As of May 28, 2025, this project has been put on hold. One-Two Sentences This project renovates the first and second floor of the Avent Ferry Technology Center (built in 1979 and renovated in 2009). The renovation will allow for the consolidation of the Office of Information Technology from other buildings on campus, improve space efficiencies, and provide spaces that better support a hybrid work environment. Current project authority is for advance planning only. The selected firm may be retained through full design and construction at the university's option.

Conceptual

Educational

$3,000,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
138
Bidding Soon
1,731
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.