Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 11, 2024 at 7:00 PM
Updated January 27, 2024
Site work for a water / sewer project in Cleveland, Alabama. Completed plans call for site work for a water / sewer project.
The work of providing AMR Water Meter Replacement Material and Installation will be let under one contract. The principal items of work are detailed herein below. Principal Work: 1. 1,300 Water Meters with Appurtenances The Contractor is hereby advised that TIME IS OF THE ESSENCE on this project and that the contract time of 180 consecutive calendar days total and noted restrictions shall be strictly observed. LIQUIDATED DAMAGES WILL BE ASSESSED IF CONTRACT TIME IS EXCEEDED. The Contractor may apply for an extension of time in accordance with the provisions of the contract; however, such an extension must be approved prior to the contract completion date to avoid the imposition of liquidated damages A. Contract work provides for the Supplier to furnish the following: 1. 1,300 3/4" Water Meters 2. 2 1" Water Meters 3. 8 2" Water Meters 4. Complete Meter Washers for correct installation furnished with meters B. Meter manufacturer to furnish all meter washers required for their meter to be installed. C. All meters shall have meter number engraved on lid cover of meter and meter. If meter is not engraved, product will be rejected. D. The Contractor shall pay all fees required by CNI to complete this Project. E. Project to be awarded on Base Bid.
Bid Results
Water / Sewer
$112,907.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2023
January 10, 2024
Multiple Locations, Cleveland, AL
Related To This Project
Cleveland, AL
Bid Date: Oct 16 2023
Cleveland, AL
Bid Date: Nov 15 2023
Cleveland, AL
Bid Date: May 23 2024
Cleveland, AL
Bid Date: Jul 31 2024
Cleveland, AL
Bid Date: Mar 31 2025
Cleveland, AL
Bid Date: Jul 14 2021
Cleveland, AL
Bid Date: Jun 17 2025
Cleveland, AL
Bid Date: Jan 18 2022
Cleveland, AL
Bid Date: Jun 08 2022
Cleveland, AL
Bid Date: Sep 12 2019
Cleveland, AL
Bid Date: Apr 19 2022
Cleveland, AL
Bid Date: May 27 2022
Dothan, AL
Bid Date: Nov 06 2023
Oneonta, AL
--
Fort Payne, AL
Bid Date: Nov 01 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
