BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2024 at 8:00 PM

Updated September 5, 2025

Demolition, site work and new construction of a mixed-use development in Los Angeles, California. Completed plans call for the construction of a 1-square-foot educational facility; for site work for a educational facility; for the demolition of a 1-square-foot theater / auditorium; and theater / auditorium.

49th Street Elementary School - Major Modernization Project The proposed Project consists of new construction, reconfiguration of existing spaces, site improvements, and demolition of school facilities. The Project scope also includes interim facilities, as necessary, to accommodate the temporary displacement of any facility and its associated function during construction. Detailed Scope of Work A. New Buildings/Structures 1. 1-Story Kindergarten Classroom Building with four classrooms and associated support spaces 2. 1-Story Multi-Purpose Room/Food Services/Library Building 3. Lunch shelter 4. Covered eating area for faculty 5. Two shade structures 6. Covered walkways/arcades B. Demolition and Removal 1. 1-Story Auditorium Building 2. 1-Story West Classroom Building 3. 1-Story Cafeteria Building 4. Lunch Pavilion (attached) Proposers that are not currently prequalified by the District must submit the Prime Contractor Prequalification Questionnaire at least ten (10) business days before and must be approved at least five (5) business days prior to the Statement of Qualifications (SOQ) due date indicated on the Important Initial Information page 2 of this RFQ. The design-build budget for the design and construction of the Project, inclusive of all costs of design, engineering, construction, supervision and management, is approximately $56 million. The budget is subject to change at any time prior to award, at the sole and absolute discretion of the District, by issuance of an addendum; or at any time after the award in accordance with the terms of the design-build contract. District has established participation goals to attain twenty-five percent (25%) of the contract dollars going to certified SBE/MicroSBE and five percent (5%) going to VBE/DVBE. All Proposers shall implement policies, procedures and methods to meet these goals, which may include but not be limited to the procurement of supplies, equipment, technical services, and/or other services under this contract.

Award

Educational

$56,000,000.00

Public - County

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
540
Active Projects
247
Bidding Soon
3,731
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2024

April 29, 2024

Project location map

750 E 49th St, Los Angeles, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.