EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 18, 2023 at 8:00 PM

Updated November 15, 2023

Site work and renovation of a civil project in Baraboo, Wisconsin. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Ho-Chunk Village - Engineering and Design of SCADA/Controls Replacements for the Wastewater Infrastructure System Site Directions: The Ho-Chunk Village community is located east of County Road BD approximately 4 miles north of the City of Baraboo and approximately 3.5 miles south of the Village of Lake Delton. The scope of the work is to review, develop, design, place out for bid (construction)/manage bidding, and manage construction of the wastewater infrastructure control/SCADA system. The system consists of a WWTF and four (4) pumping systems. The timeframe for the design/engineering shall be submitted with the proposals. The design work shall be completed in a timely fashion in order for the actually construction/replacement work to be placed out for bid (due to lead times on control equipment, time is of the essence to complete this design phase). Refer to the Request for Proposals (RFP) for complete scope of work and requirements. Selected firm shall be required to have a thorough understanding of the Village's wastewater system to ensure exact needs of the replacements are met and so that processes are not negatively impacted with the new control system. The selection of the engineering firm will be based on the requirements of the Brooks Act.

Conceptual

Water / Sewer

$330,000.00

Public - Federal

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
31
Bidding Soon
641
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2024

img_map_placeholder

Multiple Locations, Baraboo, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.