Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to an educational facility in Bowling Green, Ohio. Completed plans call for the addition of a 24,000-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
On June 20, 2024, the Board of Trustees approved the project. As of August 5, 2024, the project is under construction. *The closed solicitation has been included below for reference: Total Project Cost $30,000,000 Bowling Green State University (BGSU) is requesting interested firms to submit qualifications for Construction Manager at Risk (CMR) services for a renovation with addition of the existing Technology Building into the Technology Engineering Innovation Center on our Bowling Green campus. The Technology building is a 54,000 sq.ft. academic building, built in 1972, it sits on the north edge of BGSU's science corridor between East Merry Ave. and Leroy Ave. This project consists of selective demolition of the existing Technology Building, renovation and addition for a new approximately 73,000 sq.ft. center. The new Technology Engineering Innovation Center will provide space for several departments of the University's College of Technology, Architecture and Applied Engineering, including various academic labs for robotics, advanced manufacturing, metals/machining, ECET, BIM/CAD, and visual communication labs, along with faculty/staff offices and support spaces that enhance 21st century teaching, learning, and office best practices. "Lab spaces" will be created as flexible and interactive, reflecting advanced manufacturing business concepts and serve as a synergistic launching pad for research prototyping. The project will be divided into three phases, with goals for the first phase consisting of selective demolition and renovation of the existing Technology Building with a new addition to the south to be completed Fall 2025. Possible additional phases for modular additions to the building will be determined as the project develops and may be included in this contract as required by BGSU. The Contracting Authority reserves the right to approve the CM's selection of subcontractors and any supplemental terms to the form subcontract. Construction Cost $20,000,000 Submit all questions regarding this RFQ in writing to Jacob Konecny at konecnj@bgsu.edu with the project number included in the subject line (no phone calls please). Questions will be answered and posted to Opportunities page on the OFCC website at https://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document Construction Stage Notice to Proceed 06 / 24 Substantial Completion of all Work 06 / 25 CM Services Completed 10 / 25
Under Construction
Educational
$30,000,000.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 25, 2023
July 29, 2024
303 Thurstin St, Bowling Green, OH
Related To This Project
Bowling Green, OH
Bid Date: Oct 03 2018
Bowling Green, OH
Bid Date: Nov 30 2023
Bowling Green, OH
Bid Date: Nov 21 2023
Bowling Green, OH
Bid Date: Nov 21 2023
Bowling Green, OH
Bid Date: Dec 07 2023
Bowling Green, OH
--
Bowling Green, OH
Bid Date: Nov 21 2023
Bowling Green, OH
Bid Date: Jan 12 2024
Bowling Green, OH
Bid Date: Nov 30 2023
Bowling Green, OH
Bid Date: Nov 30 2023
Bowling Green, OH
Bid Date: Nov 01 2023
Bowling Green, OH
Bid Date: Nov 08 2023
Bowling Green, OH
Bid Date: Oct 31 2023
Bowling Green, OH
Bid Date: Oct 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.