BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 3, 2023 at 8:00 PM

Updated November 15, 2023

Renovation of a pre-engineered storage facility in Lac du Bonnet, Manitoba. Completed plans call for the renovation of a 1,040-square-foot pre-engineered storage facility.

Supply of materials and construction, and labour to complete the roof, walls, windows and doors to the lockup stage for a seasonal 26' x 40' accessory building at the Wildfire Base in Lac du Bonnet, Manitoba. The building has been completed to the framed walls stage. Construction and completion of the building to be completed by March 31, 2024. The building will be a seasonal building and will be operational spring, summer, and fall. The building will be shut down during the winter season from approximately October 31st to April 1st each year. The concrete pad and 4 walls have been completed under a previous contract. The successful bidder would be required to complete the building to lockup stage, which includes roof joists, metal roofing and siding, windows and doors. Question Acceptance Deadline: 2023/10/27 11:59:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$100,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
35
Bidding Soon
394
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2023

November 30, 2023

Project location map

70 Blueberry Rock Drive, Lac du Bonnet, MB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.