Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a pre-engineered storage facility in Lac du Bonnet, Manitoba. Completed plans call for the renovation of a 1,040-square-foot pre-engineered storage facility.
Supply of materials and construction, and labour to complete the roof, walls, windows and doors to the lockup stage for a seasonal 26' x 40' accessory building at the Wildfire Base in Lac du Bonnet, Manitoba. The building has been completed to the framed walls stage. Construction and completion of the building to be completed by March 31, 2024. The building will be a seasonal building and will be operational spring, summer, and fall. The building will be shut down during the winter season from approximately October 31st to April 1st each year. The concrete pad and 4 walls have been completed under a previous contract. The successful bidder would be required to complete the building to lockup stage, which includes roof joists, metal roofing and siding, windows and doors. Question Acceptance Deadline: 2023/10/27 11:59:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$100,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 31, 2023
November 30, 2023
70 Blueberry Rock Drive, Lac du Bonnet, MB
Related To This Project
Lac du Bonnet, MB
Bid Date: Dec 27 2023
Lac du Bonnet, MB
Bid Date: Feb 09 2024
Lac du Bonnet, MB
Bid Date: Feb 02 2024
Lac du Bonnet, MB
--
Lac du Bonnet, MB
Bid Date: Apr 26 2024
Lac du Bonnet, MB
Bid Date: Feb 12 2020
Lac du Bonnet, MB
Bid Date: Jun 04 2024
Lac du Bonnet, MB
Bid Date: Jul 02 2024
Lac du Bonnet, MB
Bid Date: Oct 19 2023
Lac du Bonnet, MB
--
Lac du Bonnet, MB
Bid Date: Oct 10 2023
Lac du Bonnet, MB
Bid Date: Aug 23 2023
Lac du Bonnet, MB
Bid Date: Mar 03 2022
Lac du Bonnet, MB
Bid Date: Aug 18 2023
Lac du Bonnet, MB
Bid Date: May 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.