BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Harrison Township, Michigan. Completed plans call for site work for a transportation facility.

The Department of Technology, Management and Budget (DTMB) on behalf of Michigan Department of Military and Veterans Affairs (DMVA), Michigan Air National Guard (MIANG), is requesting professional architectural and engineering services to perform Phase 300-700 Professional Services to design multiple projects supporting the Runway Encroachment Solution at Selfridge Air National Guard Base, Michigan. The intent of this selection process is to contract with a qualified firm to provide ad hoc professional services to design three (3) independent, but interconnected projects related to accommodating a 1,000 Linear Foot (LF) northward shift of the runway at Selfridge Air National Guard Base. These (3) design tasks collectively make up Runway Encroachment: Project #2 - Airfield Improvements: 1) Extend the north overrun of the runway by approximately 1,000 feet to the north to accommodate a 1,000 feet northern shift of the north threshold. 2) Realign the approach lighting, navigational aids, and glide slope on both the northern and southern ends of the runway. Please do not submit online questions via SIGMA VSS. All questions should be emailed to Josiah Meyers at meyersj11@michigan.gov address no later than 5:00 p.m., Eastern on Wednesday, November 29, 2023.

Award

Transportation Terminals

$74,500,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
94
Bidding Soon
1,330
All Active Projects
559
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2023

February 12, 2024

img_map_placeholder

44875 Jefferson Ave, Harrison Township, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.