BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Demolition, site work and new construction of a municipal facility in Grove City, Ohio. Completed plans call for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a 18,077-square-foot municipal facility.

The estimated costs of construction for the work outlined in the plans and specifications for the various bids are: Base Bid: $3,850,000 Alternate 1: $120,390 Alternate 2: $26,250 The work shall commence within sixty (60) calendar days after the City issues the Notice to Proceed for the Contract. The Contract shall be completed within two hundred and forty (240) calendar days from the City's issuance of the Notice to Proceed for the Contract This project requires payment of prevailing wages to all workers during the course of construction activities. Bidders must comply with the prevailing wage rates on public improvements in Franklin County and the City of Grove City, Ohio as determined by the Ohio Bureau of Labor & Worker Safety, Wage and Hour Division, 614-644- 2239. State of Ohio prevailing wage rates are included in the Contract Documents and prospective bidders shall take them into account in preparing bids. The City of Grove City, Ohio, reserves the right to reject any and all bids, Base Bid (Maintenance Building) The work included in the Base Bid for the project includes demolition of the existing Maintenance Building and the construction of the new Maintenance Building at the Grove City Ronald K. Harrison Service Complex, 3262 Ventura Blvd., including electrical, plumbing and mechanical facilities, site utilities, and other related work. Provide separate line items for the wash bay, the solar array and associated equipment for each. Alternate 1 (Epoxy Flooring) The work included as Alternate 1 for the project includes applying approximately 11,059 sq. ft. of epoxy resin flooring through the truck and wash bays, and other related work. Alternate 2 (Radiant Heating) The work included as Alternate 2 for the project includes furnishing and installing a radiant heating system throughout the truck and wash bays, and other related work.

Award

Municipal

$4,025,812.00

Public - City

Demolition, New Construction, Site Work

51

7

12

7

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
70
Bidding Soon
1,050
All Active Projects
428
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2023

December 4, 2023

img_map_placeholder

3262 Ventura Blvd, Grove City, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.