Demolition, site work, renovation and addition to a fire / police facility in Roseville, Michigan. Completed plans call for the addition of a 6,961-square-foot fire / police facility; for the demolition of a fire / police facility; for site work for a fire / police facility; and for the renovation of a fire / police facility.
https://www.candgnews.com/news/bids-for-fire-station-seresa-building-updates-approved-6839 Bids for fire station, SERESA building updates approved By: Nick Powers | Roseville-Eastpointe Eastsider | Published October 29, 2024 Featured Gallery (Click to view) ROSEVILLE — The Roseville City Council last week unanimously approved awarding bids for improvements to the South East Regional Emergency Services Authority located at 18961 Common Road and the fire station located at 17644 Frazho Road. Mayor Robert Taylor was excused from the meeting. Michigan-based Quadrate Construction LLC was awarded the contracts for both projects at council’s Oct. 22 meeting. Five bids for the project were received with Quadrate being the lowest for both projects. The bid of $1,753,813 was accepted for the total cost of the SERESA building and $1,853,789 for the fire station. A 15% construction contingency cost is assigned to both projects for unforeseen circumstances. The funds for the projects come from a bond measure that voters approved last November. These bonds are set to fund a range of projects from updates to the Department of Public Services building to a splash pad. At the council’s Sept. 10 meeting, Rain Drop Inc.’s bid was approved to put a splash pad in Rotary Park. At the Oct. 22 meeting, Councilman Bill Shoemaker asked when the projects would be started. “They’re going to work on both at the same time,” Anderson, Eckstein & Westrick Senior Project Architect Brandy Chirco said. “They plan to share the same site superintendent, so there will be constant back and forth with both projects.” In an email following the meeting, City Manager Ryan Monroe said the hope is to get the projects underway by Dec. 1. Councilman Steven Wietecha asked if the fire station would still be usable during construction. Monroe said it would not and operations will be moved to the Fire Department Headquarters at 18750 Common Road. Administrative offices will be moved to the SERESA building, which will still be usable during the construction. Fire Chief Keith Jacobs said at the meeting that trucks from the Frazho location would be moved to the Common Road location. He said a plan was in place for getting everything to fit. “The services will not decline for the citizens of Roseville,” Jacobs said in an interview following the meeting. Washington Street lift station has ‘catastrophic’ failure One of the pumps at a Washington Street lift station had a “catastrophic failure,” according to City Manager Ryan Monroe at the Oct. 22 meeting. The station has three pumps. Monroe said the failure happened the same day as the meeting. “We’ll hopefully have a pump here in a couple of days as we’re expecting rain Friday,” Monroe said. “We’ll have to bring the approval, after the fact, to your next council meeting.” Monroe estimated the pump will cost $30,000 but said this could change. The cost is able to be retroactively approved through the city’s emergency procurement ordinance. In a statement following the meeting on Oct. 24, Monroe gave an update on the status of the new pump. “The replacement pump has been ordered and we expect it to arrive in a few days,” he said. “We have manual pumps that are ready in case we receive rain over the weekend.” The Eastsider went to press Oct. 25. City adjusts marijuana policy for businesses The Roseville City Council unanimously approved two changes to its ordinance regarding marijuana at its Oct. 22 meeting. The first approved ordinance change, chapter 192 section 192-14, states that a marijuana business that makes changes to its operations, management or ownership laid out in its initial application will need to get city approval through an amended application. Roseville City Attorney Tim Tomlinson said, following the meeting, this update does away with aspects of the city’s application process that mirror what is already done at the state level. “We were just trying to streamline our process in regard to the transfer,” Tomlinson said. If the city denies the amended application, a licensee can still operate as long as proposed amendments are not in effect and the license is otherwise valid. Tomlinson said, for example, if a business shut down and the sale fell through, it could still operate under its existing license until it is amended or transferred. “That’s the only circumstance I could really see it happening,” he said. The second change updates chapter 192 section 192-42, allowing up to seven permits for a recreational marijuana business. The change to the number of permits stems from an appeal made by Crave Cannabis and the city’s acknowledgment that there was an error. “Instead of messing around with not awarding him a license for the error occurring, we felt it was in the best interest of the city to revise the ordinance to include one additional permit,” Tomlinson said. During public comment, Lamar Jarbo from Crave Cannabis said he “strongly supported” the amendment. _____________________________________ Reference Number 0000362865 Renovation and addition of an existing 6,961 sq. ft. Fire Station. The scope of work involved for this project is as follows: -Renovation and addition of an existing 6,961 sq.ft. Fire Station -The project includes removing the exterior walls of the dorm and lockers rooms to expand the station. New layouts to include individual dorms, expanded kitchen and day room, new locker rooms, and renovated dispatch. -New interior finishes and updated electrical and HVAC equipment throughout. Pre-bid questions shall be submitted to the Architect before October 3rd, at 4pm, local time. Email all questions to: bchirco@AEWINC.com. General Requirements - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % -- Each bid proposal shall be accompanied by a certified check, bank draft or satisfactory bid bond in an amount of 5% of the maximum bid amount. Checks shall be made payable to "City of Roseville". *The Owner reserves the right to reject any or all proposals and to waive irregularities in bidding, or to accept the lowest responsible proposal that, in the opinion of the Owner, will serve his best interest.
Award
Fire / Police
$1,853,789.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 10, 2024
December 9, 2024
17644 Frazho Rd, Roseville, MI
Related To This Project
Roseville, MI
--
Roseville, MI
--
Roseville, MI
Bid Date: Jan 05 2024
Roseville, MI
Bid Date: Jan 16 2024
Roseville, MI
Bid Date: Feb 13 2024
Roseville, MI
Bid Date: Mar 02 2021
Roseville, MI
Bid Date: May 01 2024
Roseville, MI
Bid Date: May 08 2024
Roseville, MI
Bid Date: Nov 02 2023
Roseville, MI
Bid Date: Aug 03 2022
Roseville, MI
--
Roseville, MI
--
Roseville, MI
Bid Date: May 10 2022
Roseville, MI
Bid Date: Mar 23 2022
Roseville, MI
Bid Date: Mar 24 2022