BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 13, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Medina, Ohio. Completed plans call for site work for a water / sewer project.

As of December 13, 2023, project was awarded to Fechko Excavating LLC, awarded amount is $3,514,109.55. Each bid must be accompanied by a Bid Guaranty, payable to the owner in an approved form. Question Deadline 10/30/2023 at 1:30 PM ET Question. Submit all Pre-bid Questions in writing to the Medina County Sanitary Engineers Office via email to Ted Bennett, P.E., Jones & Henry Engineers at Infra@jheng.com Each Proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. Attention is called to the prevailing rates of wages to be paid for labor on public improvements in Medina County, Ohio, ascertained by the Ohio Department of Commerce, Division of Labor & Worker Safety. We are advised that materials to be incorporated in this work may be purchased by the CONTRACTOR free of Ohio State Sales Tax. CONTRACTOR'S bidding on this project should be thoroughly familiar with the specifications and practices of this department. The Board of County Commissioners reserve the right to reject any and all bids, or to increase, decrease or omit any item or items and/or to award to the lowest and best bidder. his project includes all measures necessary to install approximately 4,325 feet of new water main from the Marks Road Water Tower to 775 feet west of the intersection of Fenn Road and U.S. Route 42. The water main will be constructed by open cut and trenchless methods. The work will also include new hydrants, valves, water services, and surface restoration. Approximately 1,610 feet of water main will be installed from Hanover Drive to the west branch of Fenn Road, including new valves, hydrants, and surface restoration. It is the purpose of this contract to provide all labor, materials, equipment, and maintenance of existing utilities necessary to install approximately 4,325 feet of new water main from the intersection of Fenn Road and Marks Road to 775 feet west of the intersection of Fenn Road and U.S. Route 42 and approximately 1,610 feet of new water main from Hanover Drive to the west branch of Fenn Road.

Award

Water / Sewer

$3,514,110.00

Public - County

Site Work

41

10

6

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
120
Bidding Soon
2,097
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2023

January 2, 2024

Project location map

Multiple Locations, Medina, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.