BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Groton, Connecticut. Completed plans call for site work for a water / sewer project.

****PLEASE NOTE- Attachment Pier P1044-Amend 0002- Amended Drawings that is provided with Amendment 0002 is uploaded within PIEE. Please look on PIEE for that attachment. Construction work may include, but is not limited to, construction of a concrete filled steel pipe pile supported pier extension with concrete deck, mooring fittings, mechanical and electrical utilities, an integrated composite fender system and specialized equipment including composite camels. The pier will provide two berths for general berthing and maintenance at SUBASE New London. The project will also include relocation of the floating crane's weight testing support facility. Built-in equipment includes jib cranes (1.5 tons) for supporting electrical cables between the pier and vessels and adjustable retractable crane-less brows. Work also includes demolition of the existing concrete and pile Piers 10 and 17. Site preparation includes earthwork, soil treatment, selective utility and mooring demolition, and dredging. Dredging will allow safe maneuvering room for vessels while mooring or exiting northern berths (Piers 31 Turning Basin and Pier 10) and in the following areas: turning basin, areas at the berth for navigation and maintenance operations and areas at the existing Piers 10 and 31. Dredge disposal will include the use of Confined Aquatic Disposal (CAD) cell located in the Thames River. Electrical utilities include shore power for vessels including primary and secondary distribution, transformers, substations, primary switches, grounding/lightning protection and telecommunication infrastructure. Mechanical systems include water, wastewater, compressed air, and fire protection. Environmental mitigation requirements include marine mammal and water quality monitoring, reporting to national oceanic and atmospheric administration national marine fisheries service, acoustic surveys, pre and post dredge sampling, benthic sampling and analysis of Confined Aquatic Disposal (CAD) cells and CAD cell cap assessment, shellfish resources testing and mitigation will be required to satisfy federal, state and local environmental regulations and requirements. Project will be Design-Bid-Build. NAICS Code: 237990. The magnitude of construction is anticipated to be between $100,000,000 and $250,000,000. General period of performance is anticipated to be approximately 803 calendar days. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Federal Acquisition Regulation (FAR) policy states: Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction projects with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) applies. Reference is made to: FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects; provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 Project Labor Agreement. All inquiries must be submitted in writing and received by the Contract Specialist by the date specified herein in order to permit adequate time to reply to the inquiry. There is no guarantee that PPIs submitted after the cut-off date will be answered before the solicitation closes. Submit all questions to kristy.l.gerrek.civus.navy.mil. Use of the PPI Log template is required. The PPI Log Template (Attachment A) can be found on Contract Opportunities under the Attachments section. PPI Questions shall be submitted no later than fourteen (14) calendar days prior to the proposal due date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$250,000,000.00

Public - Federal

Site Work

516

41

18

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
154
Bidding Soon
2,874
All Active Projects
1,223
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

March 3, 2025

img_map_placeholder

1 Crystal Lake Rd, Groton, CT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.