BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Marseilles, Illinois. Completed plans call for site work for a water / sewer project.

As of November 3, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Filter Backwash Controller and Valve Replacement, see attached scope of work. Vendor should provide product literature and experience documentation with the bid. Location: Lasalle Fish Hatchery Project Title: Filter Backwash Controller and Valve Replacement Project Narrative: The Lasalle Fish Hatchery is Located Adjacent to Lasalle Cooling Lake and the Lasalle Nuclear Power Plant. the Well Water is Pumped From a 750ft Well to an Aeration/degas Tower, the Water Flows Through the Tower to Remove Hydrogen Sulfide and Into a Reservoir Tank. the Water is Pumped From the Reservoir Tank Through Two Vortisand Model A2-sp-20-0 Filter Units Prior to Distribution to Fish Holding Tanks Containing Walleye and Sauger Broodfish, Walleye and Sauger Egg Incubation Jars, and Fingerling Fish After Harvest From the Fish Hatchery Ponds. These Filter Units Remove Suspended Solids (20micon), Residual Hydrogen Sulfide, and Iron Prior to Water Entering the Fish Holding Tanks. the Vortisand System Has the Original 30 Year Old Backwash Controller. Some Vital Components for This Controller Are No Longer Available for Replacement. the Ten Backwash Control Valves Have Outlived Their Normal Life Expectancy and Need to Be Replaced. Existing Flowmeters on the Water Lines Need to Be Replaced. Scope of Work: Labor and Equipment Needed to Install Backwash Controller Compatible With Vortisand Model A2-20-0 Filtration System. Controller Must Be Compatible With Aquamatic R051-1071-sa00b Stager. Backwash Controller Must Contain a Switch for Manual Backwash Initiation, Timer for Timed Backwash and Programmable Pressure Switch for Initiation of Backwash Cycle. Controller Must Be New, Unused and Free From Defects. Vendor Must Provide Product Literature With the Bid. Labor and Parts to Install 10 Aquamatic V42e, 424, 1.5 Inch Normally Open Filter Valves and One 2.0 Inch Swing Check Valve on Well Water Filtration System (Valves Supplied by Idnr-lasalle Fish Hatchery). Labor and Parts to Install Bypass Valve, Filter Housing and 6 Cartridge Filters (20 Micron, 35gpm). Parts and Labor to Install Two 1.5 Inch Outlet Flow Controllers (44 Gpm Threaded Mini Valves) on Well Water Filtration System. Outlet Flow Controllers Must Be New Unused and Free From Defects. Vendor Must Provide Product Literature With the Bid. Parts and Labor to Install One 1.5 Inch Digital Flowmeter on Backwash Flow Line, One 2.0 Inch Digital Flowmeter on Filter Outlet Pipe, One 3.0 Inch Digital Flow Meter on Well Water Inlet Pipe. Labor and Parts for Installation of a Digital Panel to Record Readings From Each Flowmeter. Flowmeters and Panel Must Be New, Unused and Free From Defects. Vendor Must Provide Product Literature With the Bid. Questions All Questions Pertaining to the Scope of Work or the Procedures, Must Be Directed to Nicole.bergee@illinois.gov All Questions Must Be Submitted in Writing No Later Than Three (3) Business Days Before the Bid Date. Question Deadline 10/27/2023

Award

Water / Sewer

$19,882.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
384
Active Projects
188
Bidding Soon
2,997
All Active Projects
1,358
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 31, 2023

November 30, 2023

June 30, 2024

img_map_placeholder

2649 N 21st Rd, Marseilles, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.