BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, remodeling, renovation and addition to an educational facility in Bloomington, Minnesota. Completed plans call for the renovation of a educational facility; for the addition of a educational facility; for the remodel of a educational facility; and for site work for a educational facility.

NCC Kopp Center Renovation OR RFP Pre-Qualification: Yes Normandale Community College's existing Kopp Student Center was originally built in 1975 with a complete remodel and addition in 2010-11. The 58,860 square foot- Kopp Student Center, houses the campus store, bookstore, campus card, campus information, dining, student clubs and organizations. Significant challenges within the building are (in no particular order): The food service operation is too large for projected on campus enrollment There is a need for enhance meeting space for student and external events Textbook service model has changed and the current space no longer reflects current processes. In addition, related supporting offices are inadequate The Campus Store has multiple entries that create concern Campus Card space is inadequate and functions poorly Diversity Center is undersized Lighting and Mechanical Systems need replacing or enhancing Normandale Community College wants the Kopp Student Center to reflect the changing business models in relation to the Food Service and the bookstore while enhancing the meeting and student space. Notably, the design drivers for the project include the principles of Hospitality (welcoming) Clarity Efficiency Inclusion Flexibility Project-specific concerns and challenges include: Estimating the number of food service locations that will be needed on a long -term basis has been challenging. We are anticipating the possibility of a Two-Phase project that will entail a portion of the food service remodel taking place in Phase II. The Textbook area needs considerable updating, but only a small window exists to complete this work without creating a significant negative impact on the ability to serve students. RFP Questions due Wednesday January 24, 2024 5:00 PM CST Submit Additional Question to our Owner's Representative- Jeanne Qualley with AFO Consultants jqualley@afoconsultants.com The estimated total Project cost is $3,500,000.00

Award

Educational

$298,475.00

Public - State/Provincial

Addition, Remodeling, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
46
Bidding Soon
780
All Active Projects
337
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2024

May 1, 2025

img_map_placeholder

9700 France Ave S, Bloomington, MN

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.