BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 2, 2023 at 8:00 PM

Updated March 19, 2025

Site work and paving for a sidewalk / parking lot in Kingston, Ontario. Completed plans call for site work for a sidewalk / parking lot.

The City of Kingston (the City) is seeking to retain Construction Services for the purposes of repaving the parking lot at 100 Days Rd. in Kingston, Ontario. The parking lot was first installed during the construction of the Centre 70 Arena circa 1970 and now includes a total paved surface area of approximately 6,665 square meters. The work is to include removal and replacement of the existing paved surface, including areas of partial depth milling, and full sub-base replacement. Other minor scopes of work include traffic marking painting, installation of signage and installation of a clear stone trench along the parking lot's north perimeter. For a complete list of the scope of work and project directions, refer to Appendix G - Specifications and Drawings. Deadline for Questions: October 27, 2023; 3:00 p.m. local time Award subject to final approval

Award

Sidewalks / Parking Lot

$283,406.00

Public - City

Paving, Site Work

6

12

4

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
47
Bidding Soon
937
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2023

December 4, 2023

Project location map

100 Days Rd, Kingston, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.