BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Winslow, Arizona. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

any questions pertaining to the plans, specifications, and bid schedule for this project shall be submitted to the Department in a written format through the Bid Express (Bidx) website The proposed work is located in Navajo County on State Route 87 at milepost 374.94, approximately 33 miles north of City of Winslow within the Navajo Nation. The proposed work consists of removing and replacing the existing superstructure. The work also includes scour retrofit, paving both sides of the approach slabs, guard rail, seeding and other related work. This project is located on a Native American Reservation, in the Navajo Nation Reservation, which may subject the contractor to the laws and regulations of the Navajo Nation Reservation and its TERO office. Contractors are advised to make themselves aware of any taxes, fees or any conditions that may be imposed by the Navajo Nation Reservation on work performed on the Reservation. This project requires electronic bidding. If a request for approval to bid as a Prime Contractor is received less than 48 hours prior to bid opening, the Department cannot guarantee the request will be acted on. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Surety (bid) bonds will be accepted only on the form provided by the Department and only from corporate sureties authorized to do business in Arizona. Bids will be received until the hour indicated and then publicly opened and read. No bids will be received after the time specified. Pre-Qualification: Yes Engineering Specialist: Jalal Kamal AZDOT - Bridge Rehabilitation - SR 87 The amount programmed for this contract is $5,600,000.

Award

Bridges / Tunnels

$3,995,708.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

43

5

9

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
53
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2023

January 16, 2024

img_map_placeholder

AZ-87, Winslow, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.