BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Eagan, Minnesota. Completed plans call for the renovation of a water / sewer project.

Project Category Code: Demolition/Building Removal/Hauling/Salvage, Erosion Control/Slope, Bank Stabilization, Traffic Control Devices (Signals, Signing, etc.), Electrical Equipment & Supplies, Directional Drilling, Lift Stations/Lift Station Equipment, Instrumentation & Control, Pumps or Pump stations, Fittings and Valves, Fittings and Valves, Sewer Inspection/Rehabilitation, Meter Vault Improvements, Erosion Control/Slope, Bank Stabilization, Piping, Well Drilling, Water Resources Infrastructure, Erosion Control - Temporary, Liquid Dust Control, Precast, Removal and Replacement of pipe Description: Work includes removal of the existing lift station controls, precast wet well lid, pump, piping, fittings, and all related appurtenances inside the wet well, removal of the existing lift station controls, precast wet well lid, pump, piping, fittings, and all related appurtenances inside the wet well, reuse the existing wet well and furnish new valve vault structure. Install new pump, piping, fittings, valves, and all appurtenances for the new station, furnish and install new controls and SCADA infrastructure. PROJECT LOCATION The project is located in the City of Eagan, MN, which is located in Dakota County. The project location is shown on the vicinity map in the design drawing set. PROJECT DESCRIPTION A. The work hereafter referred to requires the complete construction and start-up necessary for the facility with all required necessary equipment, generally described, but not limited to, in the following paragraphs: 1. Removal of existing lift station equipment and piping at the Lexington Storm Lift Station. The project includes the removal of the existing lift station controls, precast wet well lid, pump, piping, fittings, and all related appurtenances inside the wet well. 2. Reuse the existing wet well and furnish new valve vault structure. Install new pump, piping, fittings, valves, and all appurtenances for the new station. 3. Furnish and install new controls and SCADA infrastructure for the Lexington Storm Lift Station, as noted in the Contract Documents. 4. Perform various other miscellaneous and site improvements as detailed in the Contract Documents.

Award

Water / Sewer

$470,000.00

Public - City

Renovation

14

17

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
68
Bidding Soon
1,665
All Active Projects
575
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 8, 2023

January 8, 2024

June 24, 2024

img_map_placeholder

3830 Pilot Knob Rd, Eagan, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.