BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Independence, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.

Little Blue Parkway & Jackson Drive Improvements. The City of Independence is soliciting bids from qualified bidders for the Little Blue Parkway & Jackson Drive Improvements project for the Municipal Services Department. Bond requirements and liquidated damages, if applicable, will be set forth in the specifications. Questions regarding the bid process shall be submitted via Electronically. The City will respond to questions via Electronically thus providing all questions and answers to all prospective bidders equally. Deadline for questions is 5:00 p.m. local time on November 1, 2023 Please submit all questions regarding this Invitation to Bid online Liquidated Damages. If the contractor shall neglect, refuse, or fail to complete the work within the time set forth above, or any proper extension thereof granted by the City, the contractor shall pay to the City the amount specified in the bid documents for each day the entire work is incomplete. Said obligation of the contractor is not a penalty but is liquidated damages for loss to the City and the public, after the expiration of the time stipulated in the contract, as adjusted by duly executed change orders, and will be deducted from any money due the contractor under the contract. The contractor and the surety of record shall be liable for any and all liquidated damages. Specifications or Scope of Work. The proposed improvements with this project will tie into the recently approved Mo DOT Cost Share project for improvements to the I-70 & Little Blue Parkway interchange. This project will include the addition of a southbound through lane from north of Jackson Drive to the north limits of the interchange project. This work will accommodate the addition of both northbound and southbound dual left turn lanes, ADA and pedestrian upgrades, and resurfacing through the 39th Street intersection. Bond and Maintenance Guarantee. The contractor shall provide, as stipulated in this ITB, a payment, performance, and maintenance bond for faithful performance of the contract and for persons performing labor or furnishing materials in connection therewith, with sureties satisfactory to the City and in the form provided. The City reserves the right to reject any bid if the information is not submitted in a timely manner or the information, or subsequent investigation, fails to satisfy the City that such bidder is properly qualified to carry out the obligations of the contract and to complete the work as specified in the ITB.

Award

Roads / Highways

$1,050,787.00

Public - City

Paving, Site Work

41

20

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
74
Bidding Soon
1,350
All Active Projects
542
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 8, 2023

December 8, 2023

May 3, 2024

img_map_placeholder

S Little Blue Pkwy & E Jackson Dr, Independence, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.