Published February 9, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Pottsville, Pennsylvania. Completed plans call for site work for a water / sewer project.

As of February 8, 2024, Contract A is awarded to LEW Site Construction LLC - $ 6,144,214.16 but Contract B not yet awarded, a timeline for award has not yet been established. The project will be two contracts. Contract A: SCMA Waterline Relocation and Access Improvements and Contract B: SCMA Bridge Rehabilitation Bundle. Contract A: Work to be completed as Prior work to the SR0061 reconstruction project sponsored by PennDOT in the Borough of Saint Clair, Blythe Township, New Castle Township, and Ryan Township, Schuylkill County Pennsylvania. The project generally consists of the installation of 11,000 linear feet of ductile iron pipe, 2100 linear feet of HDPE via horizontal directional drilling, and associated fittings/appurtenances for relocation of raw and potable water transmission lines. The project also includes the procurement and installation of pressure reducing valve vault, improvements to existing access road, construction of new access road and all associated improvements, and installation & maintenance of erosion and sedimentation control facilities. The specific items of work for the contract are identified more specifically in the Bid Documents. Contract B: Work to include the rehabilitation of two existing abandoned railroad bridges located on SCMA property and proposed waterline alignment. The specific items of work for the contract are identified more specifically in the Bid Documents. All Bidding Documents are available at no cost at http://PennBid.bonfirehub.com. A Pre-Bid meeting will be held at SCMA, 221 South Centre Street, 3rd Floor, Pottsville, PA 17901 on Thursday, November 9, 2023, at 9:00 A.M. All work performed must comply with the Federal Aid Policy Guide, 23 CFR part 645, Subpart A, The Buy America Provisions in 23 U.S.C Section 313, 23 CFR Section 635.410, "the Build America, Buy America Act" (Public Law 117-58 Subsection 70901-52) and the PA Steel Products Procurement Act, 3 P.S. Section 1881 et seq. All Bidders must submit a bid security in the amount of 10 percent of the total bid. SCHUYLKILL COUNTY MUNICIPAL AUTHORITY Mr. Patrick Caulfield, P.E., Executive Director. Questions Due Date: Nov 24th 2023, 5:00 PM EST

Award

Water / Sewer

$589,556.00

Public - County

Site Work

175

21

312

10

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Temporary Access Roads, Temporary Roads, Traffic Control, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Rehabilitation of Cast-in-Place Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Joists
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Joint Protection, Joint Sealants
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Maintenance of Earthwork, Maintenance of Earth Moving, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
131
Bidding Soon
1,810
All Active Projects
821
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2023

January 10, 2024

img_map_placeholder

Multiple Locations, Pottsville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Waterline Relocation Project SR 0061 Section 14M (31221.03)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.