Site work for a water / sewer project in Alpena, Michigan. Completed plans call for site work for a water / sewer project.

Work under this agreement shall start within ten (10) days or on an agreed upon date after the receipt of the executed contract, which shall serve as the notice to proceed and shall be completed by the following date: June 30, 2024. Five Hundred ($500) dollars per day will be deducted from monies due the Contractor for each calendar day, exclusive of Sundays and holidays, that the work remains uncompleted beyond the completion date. Written extensions will be reviewed and may be approved by the City Engineer with justifications. Performance Bond: A bond satisfactory to the City, executed by a surety company authorized to do business in the state or otherwise secured in a manner satisfactory to the City, in an amount equal to 100% of the price specified in the contract; and Labor and Material Payment Bond: A bond satisfactory to the City, executed by a surety company authorized to do business in the state or otherwise secured in a manner satisfactory to the City for the protection of all persons supplying labor and material to the contractor or its subcontractors for the performance of the work provided for in the contract. The bond shall be in an amount equal to 100% of the price specified in the contract. The Undersigned understands that the Owner reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the Owner in accordance with section "Award Process". A bid bond provided by a surety company authorized to do business in the state, or the equivalent in cash, or otherwise supplied in a form satisfactory to the City for a sum of not less than five percent (5%) of the amount of the minimum base bid will be required with each proposal submitted where the cost estimated by the bidder exceeds $35,000. The City reserves the right to require bid security for bids under $35,000 when the circumstances warrant.

Award

Water / Sewer

$26,775.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
5
Bidding Soon
92
All Active Projects
32
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2023

November 30, 2023

img_map_placeholder

Multiple Locations, Alpena, MI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.