BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a civil project in N Charleston, South Carolina. Working plans call for site work for a road / highway; and for paving for a road / highway.

The proposed project consists of establishing a freshwater stream and wetland umbrella mitigation bank in the Edisto River (HUC 03050206) and Four Hole Swamp (HUC 03050205) Subbasins within the Middle Atlantic Coastal Plain Level III Ecoregion. The BFUMB is entirely contained within Brosnan Forest and is proposed to be comprised of five individual mitigation bank sites, each associated with and situated within one of five unrestored watersheds on Brosnan Forest as follows: Indian Field I, Indian Field II, Tom & Kate Branch, Turkey Creek South, and Walnut Branch. With the exception of a small portion of the Walnut Branch watershed, the BFUMB is proposing to extend from the headwaters of each of these unrestored watersheds to the points where each of these watersheds exit Brosnan Forest. The five watersheds evaluated for the proposed BFUMB span approximately 8,629 acres of Brosnan Forest's 14,405 acres. BFUMB is proposed to complement the currently established adjoining Brosnan Forest Mitigation Bank (BFMB) and Brosnan Forest Coldwater Branch Mitigation Bank (BFCBMB). Preliminary evaluations conducted to approximate the potential stream and wetland mitigation opportunities within each of the five sites initially proposed within the BFUMB resulted in the estimated opportunity for approximately 121,000 linear feet of stream mitigation (an estimated 60,539 FF) and approximately 2,200 acres of potential wetland mitigation within the BFUMB. The plan for the BFUMB involves the restoration, enhancement, and/or preservation of the streams, riparian wetlands, non-riparian wetlands, and associated forested buffers and uplands within each of the five mitigation sites. Primary restoration activities for the bank sites would include: 1) removing loblolly pine plantations, 2) removing dams, roads, and other earthwork to the extent practicable, 3) filling/plugging ditches to restore hydrology, 4) planting native trees and shrubs to restore wetland plant communities, 5) restoring stream channels and associated wetlands in historic valleys, and 6) suppressing nuisance and invasive species vegetation. The Sponsor is proposing to add the Indian Field II (IFII) Mitigation Site (33.1513, Longitude: -80.4308) as the first site under the BFUMB. Preliminary evaluations conducted to approximate the potential stream and wetland mitigation opportunities for the IFII Mitigation Site resulted in the estimated opportunity for approximately 18,000 linear feet of stream mitigation, representing more than 9,500 functional feet, and approximately 200 acres of potential wetland mitigation.

Final Planning

Water / Sewer

$450,000.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
65
Bidding Soon
692
All Active Projects
328
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

img_map_placeholder

US-78, N Charleston, SC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.