BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 1, 2024 at 7:00 PM

Updated March 2, 2024

Site work for a water / sewer project in Fort Myers, Florida. Completed plans call for site work for a water / sewer project.

782 LF BANK RESTORATION OF LAKE 105 This Contract is for the restoration of the lake banks of Gateway Lakes 57, 105, 125, and 128 as specified herein. Restoration shall be accomplished by use of an anchor reinforced vegetation system (ARVS), non-woven geotextile, or other repair cross section as shown on the Drawings. The Work consists of furnishing all labor, all equipment, and materials (see below) required for construction, consisting of but not limited to the following: Providing all surveying and field engineering services to establish vertical and horizontal datum and control. Staking residential lot lines, lake maintenance easement locations, and all other services necessary to complete the work as required by the contract documents. All excavation, fill, and compaction required to establish a consistent slope along the lake as shown on the Drawings. Installation of an ARVS and/or non-woven geotextile along the perimeter of the lake as shown on the Drawings. Installation of Flexamat and littorals along the perimeter of the lake as shown on the Drawings. The scope is further defined and detailed within the Plans, Technical Specifications and General Conditions associated with this project. Contractor is responsible for reviewing all documentation associated with this project. All work performed shall follow all Federal, State, Local, District, OSHA and department mandated regulations and specifications for associated work. The DISTRICT contact person for questions concerning Contract Procedure is Gateway Services CDD, Contracts Manager, 11922 Fairway Lakes Dr., Suite #1, Fort Myers, FL. 33913, Phone (239) 561-1313 ext. 202, Fax (239) 561-1350. Questions due January 10, 2024 @ 2:00 PM Question responses due January 12, 2024 Letter of Recommendation from Engineer for BOS January 25, 2024 Contract approval by Board of Supervisors (TENTATIVE) February 1, 2024 The District reserves the right, in its sole judgment in the best interest of the District, to waive any informalities in any bids; to make award(s) including multiple awards; to waive any non-substantive, in District's sole judgment, irregularity or technicality in bids received, and/or to reject any or all bids.

Award

Water / Sewer

$991,626.00

Public - City

Site Work

64

10

48

8

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
71
Bidding Soon
995
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2024

February 21, 2024

Project location map

Multiple Locations, Fort Myers, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.