BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Salmon, Idaho. Working plans call for site work for a water / sewer project.

The Salmon-Challis National Forest may issue a future for reconstructing the Wallace Lake Campground water system that was damaged during the 2022 Moose Fire on the Salmon-Cobalt Ranger District of the Salmon-Challis National Forest the spring of 2024. The current government estimate for reconstruction is approximately 3,500 ft of HDPE line, new storage tank, 6 new hydrants, and 2 daylight drains, along with other valve boxes as necessary. This is not a solicitation and in no way commits the Government to award a contract. The Government does not intend to award a contract(s) based solely on this site visit nor does it intend to pay for any costs incurred in response to this announcement. The intent of this notice is to ensure that prospective contractors may see the areas prior to snowfall obscuring the ground or preventing access prior to issuing the solicitation. This solicitation should be issued in March or April of 2024. The work anticipated under any contract resulting from the solicitation will be started around July 15, 2024. Please inform Steffan Wilcox, Civil Engineer, if you plan to attend by calling him at 406-596-2382 (or email steffan.wilcox@usda.gov) by noon of the day before the site visit. The function of the Forest Service site visit is to show the on-the-ground condition and location of the work areas, boundaries and other in-place markers, and the routes of travel that may be utilized in going to and from the work areas. ACCESS: Directional information may be obtained from Supervisor's Office at (208) 756-5100. Access to the site outside of the scheduled site visit may be behind gates or barricades, or snow due to seasonal closures or to protect public safety and must be viewed on the scheduled site visit, or "walk-in" may be required. Interested parties desiring to visit units on their own should coordinate travel with the Supervisor's Office. Maps will be available at the Supervisor's Office. Site Visits may be held in person, utilize TEAMS w/video of the site or pictures. Ensure all questions and answers are emailed to the contracting officer: matthew.sutton@usda.gov

Final Planning

Water / Sewer

$200,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
26
All Active Projects
6
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

img_map_placeholder

Wallace Lake Rd, Salmon, ID

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.