BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a mixed-use development in South Whitehall Township, Pennsylvania. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for site work for a educational facility; and 40,000-square-foot, two-story above grade educational facility.

https://www.lehighvalleynews.com/parkland/addition-to-parkland-school-districts-new-operations-center-gets-ok-from-planning-committee ALLENTOWN, Pa. -- Completion of Parkland School District's new operations center took another step closer to becoming a reality on Tuesday. Lehigh Valley Comprehensive Planning Committee unanimously approved an application from the school district for a 12,832-square-foot addition to the second floor of the new center currently under construction at 2619 Stadium Road, Orefield. The new operations center will be a two-story, 39,295-square-foot facility that will house the district's food service, curriculum, facilities and operations, technology and teaching and learning departments. Parkland School District plans The new operations center will be a two-story, 39,295-square-foot facility that will house the district's food service, curriculum, facilities and operations, technology and teaching and learning departments. The lower level will be for storage space, and the upper level for offices. The addition would house the district's alternative education programs, which include Alternative Education Disruptive Youth, Parkland Behavior Strategies Program and the Parkland Virtual Academy, as well as the district's social workers. Construction costs were estimated to be $19.9 million. Some recommendations The original operations center plan is expected to be completed in October. The initial proposal to build the new operations center was originally reviewed by Lehigh Valley Planning Commission on December 16, 2022. School district operations are now based mainly in the Troxell building at 1210 Springhouse Road, but other departments operate in other buildings. Parkland School District During its review of the proposal for the addition, the comprehensive planning committee recommended that because of the proximity of Interstate 476 to the east side of the tract, communication with the Pennsylvania Turnpike Commission to ensure that impacts to the turnpike rights-of-way are addressed. The LVPC also recommended that the school district verify there will be sufficient onsite parking to accommodate the expansion, compared with the previous review provided by LVPC in December 2022. Signage and a pavement-marked crosswalk should be added on Stadium Drive to communicate to drivers that vulnerable road users cross the roadway to access the building and Orefield Middle School, the committee recommended. School district operations are now based mainly in the Troxell building at 1210 Springhouse Road, but other departments operate in other buildings. ________________ Phase 2 - Core & Shell Expansion

Under Construction

Educational

$2,900,000.00

Public - City

Addition, Demolition, Site Work

36

20

18

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
567
Active Projects
307
Bidding Soon
3,990
All Active Projects
1,787
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 9, 2023

January 9, 2024

October 1, 2024

img_map_placeholder

2619 Stadium Dr, South Whitehall Township, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.