BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2024 at 8:00 PM

Updated September 11, 2024

Renovation of a water / sewer project in Santa Rosa, California. Design plans call for the renovation of a water / sewer project.

Per the owner, as of September 10, 2024, an engineering team has been selected and the project is currently in design. The owner states that construction bidding will likely take place in the summer/fall of 2025. Closed solicitation has been included below for reference. .......... Delta Pond Pump Station: The Delta Pump Station delivers pressurized reclaimed water from Delta Pond to the West College mainline and does not have an emergency generator. It is accessed through the SCWA flood control road on the SW side of Santa Rosa Creek. 12kv power is supplied to the Delta Pump Station through the PG&E overhead power lines from Hall Road. During winter storms the SCWA flood control road into Delta may be too flooded for vehicle access. This project will provide the necessary standby emergency power capabilities in an effort to keep valves and controls operational in the event of a power failure. The generator will only supply emergency power for valves/actuators and SCADA/communication. LTP Process Boiler #1: The process Heat Reservoir Supply (HRS) and Heat Reservoir Return (HRR) System located at the LTP take heat generated by either the CHP engines or the plant boilers and transports the heated water to heat the digesters. There are two gas-fired boilers: Fire-Tube Boiler 4,184,000 BTU/hr and Fire-Tube Boiler 3,638,000 BTU/hr. The boilers are used as a secondary source of heat and are required to operate when heating demands are high or in the event that the CHP engines are not running. Both boilers were installed in 1990 with one currently non-operational as it has failed Air Board emission test requirements. One boiler is non-operational and the other is experiencing operational issues during use. The boilers have reached the end of their service life and require replacement. The replacement project scope will replace the two boilers and associated plumbing and electrical appurtenances. Alternative boiler types/fuel sources and controls will be explored in a cost/benefit analysis. The method of Contractor Selection has not been Determined at this time.

Design

Water / Sewer

$1,590,000.00

Public - City

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
11
Bidding Soon
1,388
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

Project location map

Multiple Locations, Santa Rosa, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.