BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Lansing, Michigan. Completed plans call for the renovation of a playground / park / athletic field.

https://www.victoriaadvocate.com/lansing-picks-firm-for-6-2m-renovation-of-moores-park-pool/article_43b51fb6-29c6-5161-becf-41465d3d0c91.html (The Center Square) – Lansing Mayor Andy Schor said the city of Lansing Parks & Recreation Department has accepted a bid from Rhino Recreational Construction from Novi, Michigan to redevelop the Moores Park Pool. The bid came in at $6.2 million and was the only firm to submit a bid to redevelop the pool built in 1923. “The Moores Park Pool holds a special place in the hearts of so many Lansing residents,” Schor said in a statement. “For nearly 100 years it was a place to cool down on a hot summer day and spend time with family and friends. The efforts to restore this historic structure have been underway for several years, but took a huge step forward earlier this year when the state appropriated the dollars to fund the project and restore this gem.” Officially named the J.H. Moores Memorial Natatorium, the Moores Park Pool will require extensive repairs and renovations. After decades of deferred maintenance and patchwork repairs, the pool was closed in 2019 after badly leaking. At that time, efforts began in conjunction with the Friends of Moores Park Pool group and Preservation Lansing to study construction needs and costs. The city hired WTA Architects to assess the pool. Based on this study, the Michigan Legislature allocated $6.2 million in the state budget to fund these needed repairs. The record-setting $82 billion budget funded $7.6 million for public pool repairs: $6.2 million for Moore’s Park pool in Lansing, $1.2 million for the Forest Brook pool in Ann Arbor, and $200,000 for a Ypsilanti pool. The City then put out a request for proposals to have a qualified construction company perform the work. “Thank you to our incredible legislative delegation, including Sen. Sarah Anthony and Sen. Sam Singh, and Rep. Emily Dievendorf, Rep. Kara Hope, and Rep. Angela Witwer for working to ensure this critical funding was part of the state appropriation process,” Schor said. The Schor administration will send a budget resolution to city council to accept the money in January 2024. If that is passed, the Parks & Recreation Department will finalize the contract with the vendor and develop a full construction schedule for the project. Listed on the National Register of Historic Places, the Moores Park Pool was designed by City Engineer Wesley Bintz and opened to the public in 1923. ----------------------------------------------------------------------------------------------------- Reference Number 0000335680 Location: The location of the proposed construction for the project known as B/24/066, is 420 Moores River Drive Rebuilding of the Moores Park Pool If you have any questions please contact Stephanie Robinson, Senior Buyer, at (517) 483-4128 or email: Stephanie.robinson@lansingmi.gov. Technical questions should be directed to Greg Satterfield @ (517) 483-6936. Question Acceptance Deadline 12/05/2023 02:00 PM EST (as per Addendum 1) General Requirements - Bid Deposit Required - Certified Payroll - Insurance Required - Local Service Required - Onsite Maintenance Required - Prevailing Wage Required A Bid Guaranty (in accordance with Federal Circular No. 570) in the amount equal to but not less than 5% of the total amount of the proposal shall accompany all bids. Certified checks, bank drafts, negotiable U.S. Government Bonds. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % *The City reserves the right to accept any bids, to reject any or all bids and to make the award in the best interest of the City.

Award

Swimming Pools

$6,254,252.00

Public - City

Renovation

66

27

13

10

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
105
Bidding Soon
1,367
All Active Projects
587
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

January 15, 2024

img_map_placeholder

420 Moores River Dr, Lansing, MI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.