BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Surrey, British Columbia. Completed plans call for site work for a road / highway.

Tilting-pole Anemometer Base, Anchor Design and Construction at Bonilla Island, North Coast British Columbia. Location: Bonilla Island, North Coast British Columbia Two Phase Selection Process: This is the first phase (Phase One) of a two-phase competition. The first phase will evaluate the qualifications of all bidders. The second phase, (Phase Two), will invite the qualified bidders to provide a financial bid on the project based on the specifications and drawings. Upon award of a contract in Phase Two, the pre-qualification list resulting from the first phase will expire and will not be used in any other solicitation. Work Description: To engage the services of a contractor with the expertise and resources to provide design and construction of suitable foundation and guy anchors for tilting-pole anemometer towers located at Bonilla Island (AUT) 53.492900 -130.639000 The Meteorological Service of Canada tilting-pole anemometer tower (tilt-pole) is designated to expose the anemometer to conditions 10m above the surrounding surface and yet easily tilt down so that the sensors can be service by a technician standing on the ground. SCOPE OF WORK 1. Geotechnical Assessment. 2. Detailed engineered foundation drawings specific to site. 3. Install Anemometer Tower foundation and anchors. Meteorological Service of Canada (MSC) is responsible for installing and maintaining a network of coastal weather stations. One of the most important coastal weather parameters is wind, which is primarily measured by anemometers mounted 10m above the surface. These anemometers need annual maintenance and calibration checks. Historically they been mounted on climbable towers, or indeed any structure that gave close to 10m elevation above the local surface. Due to the chance of a fall, or the incapacitation of a technician on the tower, climbable anemometer towers have raised some significant Occupational Safety and Health concerns. In the mid-1990 a nation-wide program was begun to replace these climbable towers with tilting-pole towers, which enable a technician to service the anemometer while standing on the ground. There remain a handful of climbable wind towers on the west coast of British Columbia and the intent of this process is to replace climbable tower with tilting pole at Bonilla Island this fiscal year ending Mar 31, 2024. Delivery Date: Anticipated project completion date is March 31, 2024. Estimated Value: To assist with bonding and insurance requirements, this project is estimated to cost approximately between $100,000.00 and $150,000.00 (taxes excluded).

Post-Bid

Roads / Highways

$150,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
64
Bidding Soon
2,132
All Active Projects
771
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.