BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Carlsbad, California. Design plans call for the construction of a 41,900-square-foot, two-story above grade municipal facility; for site work for a municipal facility; 40,970-square-foot industrial development; 92,300-square-foot, four-story above grade parking garage; and 640-square-foot service station / car wash facility.

As of November 7, 2024, the project is in early design. The project is tentatively scheduled to bid in the second quarter of 2025. Closed solicitation has been included below for reference. ........... The City of Carlsbad (City) is soliciting this Request for Proposal (RFP) to obtain proposals for architectural design, permitting and construction administration services for the Citys Orion Center project, a new operations and maintenance facility to be located at 2600 Orion Way, Carlsbad, CA, 92010. A conceptual design for the Orion Center has been developed, reflecting the co-location of staff from the City Public Works Branch s Streets Maintenance and Facilities Maintenance Divisions and the Parks & Recreation Department s Trees and Parks Maintenance Division. Preliminary design and programming needs for a much larger facility were developed for the purpose of obtaining a Conditional Use Permit (CUP). This CUP was granted on April 5, 2023, and is included as Attachments A and B. The CUP documents represent an initial concept for a larger facility, and the city would now like to have the design work for a smaller facility thoroughly completed with corresponding construction documents and technical specifications, submitted to and managed through, the plan check and building permitting process, so staff can then use them to solicit construction bids. The city will also need the design services firm to remain engaged for construction administration services throughout the construction process. The site does not currently have a street address as it is an undeveloped lot; however, the future address of the project will be 2600 Orion Way, Carlsbad, CA 92010. Question Deadline 11/08/2023 at 5:00 PM PT Online Q&A Yes Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% The method of Contractor Selection has not been Determined at this time.

Design

Service Station / Car Wash

$38,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
132
Bidding Soon
2,202
All Active Projects
1,021
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2025

img_map_placeholder

2600 Orion Way, Carlsbad, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.