BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Hartsville, South Carolina. Completed plans call for the renovation of a educational facility.

Hartsville Middle School (HMS) Cafe' HVAC. It is the intent of the Darlington County School District to secure a source to replace HVAC unit at Hartsville Middle School Caf located at 1427 14th Street, Hartsville, SC 29550 II. Scope of Work It is the intent of the Darlington county school district to replace (2) existing 20 ton carrier heat pumps located in the cafe at HMS. The current units Carrier brand, have four condensing units are located on ground level running with two air handlers located above a dry storage supply room located above the kitchen area. The model and serial information for the existing units are as follows. CU 18 model #38ARQ012--601. CU 18 serial #0706G30121. 460V, 3ph. CU18a model #38ARQ012--601. CU18aSerial #0306G20152. 460V, 3ph. CU19 model #38ARQ012--601. Serial #0306G20151. 460V, 3ph. CU19a Model #38ARQ012--601. Serial #0306G20149. 460V3ph. Air Handler 1, Model #40RMQ024-B611 HC. Serial #0406X00875. 460V 3ph. Air Handler 2. Model #40RMQ024-B611 HC. Serial #0406X00874. The new units will be: (2) 20 Ton Heat Pump Condensers with R410a refrigerant (2) 20 Ton Air Handlers with 30 KW heat strips The new units must be Trane, (American Standard) or Carrier, (ICP). The existing disconnects may be re-used for the new units. Please include hail guards on the condenser units. The new unit must include 30kw heat strips for 2 nd stage heat. The DCSD will use existing control wiring. We will also use existing thermostats. The DCSD will require the existing copper line sets to be changed out with the new units. The current line set size is 1 1/8" X 5/8". New line sets must include new insulation with proper hangers and brackets. The current duct work and sheet metal must reconnect to the new system. New air handler stands are to be included. New drain pans with float switches need to be installed as well as new drain lines with adequate slope. A Lull or crane will be required to set new units. All holes caused or uncovered during installation must be properly sealed back up. All safety precautions must be kept to protect students, staff, as well as parents. Old equipment and debris must be cleaned up and hauled away by the contractor. All materials and supplies used to install/replace this unit must be furnished and installed by the contractor and included in this bid. All work must be completed including start-up by Dec. 31 st , 2023. Site Address: Hartsville Middle School 1427 14 th Street. Hartsville, SC 29550

Award

Educational

$105,100.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
144
Bidding Soon
1,643
All Active Projects
722
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 6, 2023

December 6, 2023

December 31, 2023

img_map_placeholder

1427 14th St, Hartsville, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.