BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 11, 2024 at 7:00 PM

Updated April 26, 2024

Site work and paving for a mixed-use development in Parker, Colorado. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000333551 Question Deadline 11/08/2023 at 4:00 PM MT All bidders questions and inquiries shall be directed to the Town of Parkers Project Manager, Tom Gill, Project Manager at teilî@parkeronline/303-805-3190. Job Location Town of Parker Road Name Parker Road Construction of a new multi-use trail and pedestrian bridge adjacent to Parker Road (State Highway 83) between Parker Square Drive and Sulphur Gulch. Work includes but is not limited to approximately 1,800 CY of embankment material, 80 SY concrete pavement (10'), 2,500 SF of masonry landscape wall (dry stack), 280 LF of pedestrian railing, 150 CY of concrete class DF (bridge), 2,330 SY of concrete sidewalk (6"), and two each of pedestrian bridge girder and deck units, and associated earthwork, erosion control, and traffic control. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 %

Award

Bridges / Tunnels

$2,948,428.00

Public - City

Paving, Site Work

140

5

2

5

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
58
Bidding Soon
1,272
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2023

March 1, 2024

Project location map

CO-83, Parker, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.