Renovation of a municipal facility in Colorado Springs, Colorado. Completed plans call for the renovation of a municipal facility.

Date Email Questions Due:jamie.gott@state.co.us Nov 14, 2023 1:00pm Colorado Department of Human Services (CDHS), Division of Facilities Management (DFM) is requesting proposals to select a qualified construction manager or general contractor (CM/GC) for the second phase of the SLFRF Refurbish HVAC and Mechanical Equipment, Zebulon Pike, Pueblo, and Spring Creek Youth Services Center project. The project scope includes for but not limited to, the repair or replacement for the facilities sanitary and storm water sewer lines, replacement of three (3) existing HVAC furnaces and (3) condensing units, replacement of the facilities main distribution panel (MDP), and dependent upon budgetary allowance, the replacement of thirteen (13) electrical sub panels. As the Zebulon Pike, Division of Youth Services (DYS) facility is a 24/7/365 operating facility, the CM/GC will be required to include for limited service disruptions and for providing bypass or backup systems to impacted life, health, and safety systems of facilities within the project parameters. This may include for, but not limited to, the sanitary and storm sewer mains and for down time during the replacement of the MDP. CDHS/DFM has contracted an Architecture/Engineering (A/E) consultant team, Schendt Engineering Corp, who have begun site surveys, scoping of sanitary and sewer drain lines, and analysis of as-built document analysis, as part of, providing design options for final selection to CDHS. The contracted CM/GC shall be coordinating and collaborating as part of this design process to provide construction specific related insight to the design team's decision making. The CM/GC process is ultimately a collaborative team effort that is created in order to preventing cost overruns, change orders, and in providing a successfully completed project delivery to CDHS. CDHS shall be using a Construction Manager/General Contractor (CM/GC) approach to project delivery. A Guaranteed Maximum Price (GMP) and an updated project duration schedule will be established by the A/E and the CM/GC in conjunction with CDHS. The CM/GC will evaluate, among other things, availability of materials and labor, project schedule, project costs as they relate to the established budget, constructability, and will work closely with the A/E and CDHS throughout the planning, design and construction phases of the project. Construction is estimated to commence April 2024. This project must be fully encumbered by December 30, 2024 and complete project close out by December 30, 2026. The process to be used in the selection of the CM/GC is comprised of two steps. STEP I is the Submittal of Prequalification as described in Section II (D). STEP II is the Oral Interview/Cost Proposal as described in detail in Section III. A Jury Panel of individuals who will be involved in the project and/or understand the required services associated with CM/GC will evaluate responses to this RFP for both STEPS. Upon completion of the evaluation of the Submittals of Prequalification, a limited number of firms will be invited to the oral interviews. Sealed fee proposals will be required only from those firms who are interviewed and are to be submitted as indicated in this RFP. Both qualifications and cost will be considered in the final ranking of firms with qualifications given 70% of the value of the weighted criteria and fees for the Cost/ Proposal given 30%.

Post-Bid

Municipal

$300,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
76
Bidding Soon
1,190
All Active Projects
518
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 27, 2023

February 1, 2024

December 30, 2026

img_map_placeholder

3190 E Las Vegas St, Colorado Springs, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.