BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Site work and paving for a civil project in Stuart, Florida. Design plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

As of November 2025, the project is in the programming and design phase. Construction documents are expected to be completed in 2028. A firm contractor bidding and construction schedule have not been established. *The closed solicitation has been included below for reference: Project Threshold : Project is Less than $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 08 Selection Method : Letter of Response and Oral Presentation Project Description : TPK Mainline Interchange Improvements at SR 714 MP 134.5 Plain Language Description : 446165-1 Turnpike Mainline Interchange Improvements at SR 714 (MP 134.5) 446333-1 & 446334-1 Widen TPK (SR91), SW Martin Hwy to St. Lucie County Line (MP 134.5-138.08) - 4 to 8 lanes & Widen TPK (SR91) from Martin County Line to Becker Rd (MP 138.08-138.5) 4 to 8 lanes 446335-1 Widen TPK Mainline, SW Becker Rd to Crosstown Parkway (MP 138.5-144.58) - 4 to 8 lanes 452120-1 Widen Western Beltway (SR429), North of US 192 to North of Western Way (MP 6-8) 452121-1 Widen Western Beltway (SR429), North of Western Way to Seidel Road (MP 8-11) 436194-3 Widen TPK (SR91) from US 192 to Partin Settlement RD (MP 242-243.5) 4 to 8 lanes Number of contracts that may be awarded from this advertisement : 6 Advertisement Date 10/24/2023 Response Deadline Date/Time 11/07/2023 03:30 am Longlist Date/Time 11/29/2023 07:30 pm Shortlist Selection Date/Time 12/05/2023 07:30 pm Oral Presentation Date/Time 1/17/2024 Final Selection Date/Time 2/06/2024 07:30 pm Negotiations Period Begin Date 2/09/2024 Negotiations Period Ending Date 4/19/2024 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - TPK Mainline Interchange Improvements at SR 714 MP

Design

Roads / Highways

$15,260,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
27
Bidding Soon
1,394
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.