Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Lexington, Kentucky. Working plans call for the renovation of a educational facility.
Project Description Install a 20-year Warranty Urethane-coated Spfr Roof System on Six (6) of Ten (10) Roof Sections of the Seaton Center. The Project Includes: Infrared Scan to Locate Possible Wet Insulation, Remove Wet Insulation and Replace With Like Material, Mechanically Attach 1/2 " Densdeck Over Existing Roof Membrane, Replace the Coping on the Perimeter Walls With a New Foam Stop and Apply New Foam and Coatings. Remove Parapet Wall Flashings and Apply Foam and Coatings, Re-construct Building Expansion Joints Between Lancaster Aquatics and Seaton Center. Re-construct Building Expansion Joint Between Johnson Center and Seaton Center. Renovate Existing Field Expansion Joints to Original Condition, Install a Ladder Between Upper Section 2 and Lower Section 5, and Install 20-year Urethane-coated Foam Roof System. Building Outages and Electrical Hook Up by Uk Ppd Included. Method of Receiving Bids Bids Will Be Received From Prime Contractors on a Lump Sum Amount for the Total Project. All Phases of the Work Shall Be Bid to and Through the Prime Contractors. Bids Shall Be Submitted in the Manner Herein Described and on the Official Proposal Form Included With the Conditions and Specifications and Shall Be Subject to All the Conditions as Set Forth and Described in the Bid Documents. Bids Shall Be Submitted Only on the Official Forms Supplied by the University of Kentucky, Construction Procurement Section and in the Following Order: 1. Form of Proposal 2. Determination of Responsibility 3. Bid Bond **please Ensure There Are No Staples (Check Your Bid Bond). 4. Method of Award Final Award of Contract Will Be Made on the Basis of the Lowest, Responsive and Responsible Bid Which Offers the Best Value. Schedule of Project the Time for Substantial Completion for All Phases Shall Be Ninety (90) Consecutive Calendar Days and Final Completion Shall Be Thirty (30) Consecutive Calendar Days Thereafter. Substantial Completion Will Include All Site Restoration Completed, Site Clean-up and Fully Functional. 6. Bonding All Bids Shall Be Accompanied by a Bid Guarantee of Not Less Than Five (5%) Percent of the Amount of the Base Bid. a 100% Performance Bond and 100% Payment Bond Shall Be Furnished by the Successful Bidder. All Bonding and Insurance Requirements Are Contained in the Instruction to Bidders, General Conditions and Special Conditions. Payments for Plans, Specifications and Official Bid Documents Must Be Made to Lynn Imaging Before a Set of Documents Will Be Issued. Notes: Contractors That Receive Plans and Specifications From Other Sources Than Lynn Imaging Must Request a "form of Proposal" From the University's Purchasing Representative to Be Registered as Plan Holders and to Receive Addendums. Potential Contractors Must Identify the Position of Their Firm as a Prime Bidder, Miscellaneous Subcontractor, Material Supplier or Other When Ordering of Picking Up Plans and Specifications. Bids, Upon Their Receipt by the University of Kentucky, Construction Procurement Section Are Stamped Showing the Hour and Date Received. Bids Received After the Scheduled Closing Time for Reception of Bids Will Not Be Considered Provided Legal and Accepted Bids Have Been Received on Said Referenced Invitation. 10. Bid Withdrawal No Bidder May Withdraw His Bid for a Period of Sixty (60) Days After the Date Set for the Opening of Bids. Clerical Errors and Omissions in the Computation of the Lump Sum Shall Not Be Cause for Withdrawal of the Bid Without Forfeiture of Bid Bond. Bids May Be Withdrawn in Person Only, Prior to the Closing Date for Receipt of Bids. 11. University of Kentucky Supplier Diversity Intitative University of Kentucky Strategic Vision: as Kentucky's Indispensable Institution, We Transform Lives Through Diversity and Inclusion, Discovery, Research and Creativity, Promotion of Health and Deep Community Engagement. Mission: the University Plays a Critical Leadership Role by Promoting Diversity, Inclusion, Economic Development, and Human Well-being. as the Flagship Institution in Kentucky, Uk Plays a Critical Leadership Role for the Commonwealth by Contributing to the Economic Development and Quality of Life Within Kentucky's Borders and Beyond. the University Nurtures a Diverse Community Characterized by Fairness and Equal Opportunity. We Will Diligently Seek and Work With Companies That Share Our Vision, Mission, and Values. Supplier Diversity Goals: We Are Committed to Increasing the Purchasing of Goods and Services From Minority, Women, Veteran, and Disabled-owned Businesses to a Minimum of Ten Percent With an Aspirational Goal That Equals and Surpasses the Diversity on Our Campus and in the Communities We Serve. in Addition, Uk Supports Non-profit Work Centers for the Blind and Disabled. All Contractors Are Expected to Reach These Goals. Bidders Utilizing Minority, Women, Veteran, and Disabled-owned Businesses Are Requested to Identify These Contractors and Suppliers in the Space Provided on the Form of Proposal. the Successful Contractor Will Be Asked to Supply Associated Contract Amounts Rounded to the Nearest $500.00 Prior to the Signing of a Contract. for Assistance in Identifying Diverse Businesses and Contractors Please Contact Marilyn Clark, Supplier Diversity Manager, University of Kentucky at Mcl256@uky.edu. Right to Reject the University of Kentucky, Construction Procurement Section, Reserves the Right to Reject Any and All Bids and to Waive All Formalities and/or Technicalities Where the Best Interest of the University May Be Served. Written Questions Anyone Wishing to Discuss Specific Items is Requested to Submit the Items in Writing to Capital Construction Procurement, No Later Than 11/6/2023 at 1:00 Pm Lexington, Ky Time. Written Questions Can Be Submitted by Email to Corey Leslie at Cckbidquestions@uky.edu or Fax to 859.257.1951. Please Use the Bid Number and Title in the 'subject' Line of Your Email. Note: Responses to Written Questions Received No Later Than 11/6/2023 Will Be Provided in an Addendum Issued on or About 11/13/2023. 15. Substitution - Materials and Equipment Bidders Wishing to Submit a Request for Consideration of an Alternate Under the Provisions of Article 48.3 of the General Conditions to the Contract to Any Article, Device, Equipment, Product, Material, Fixture, Patented Process, Form, Method or Type of Construction, or by Name, Make, Trade Name, or Catalog Number Shall Submit a Written Request to the University at Least 14 Calendar Days Prior to the Official Bid Date of the Project Including All Necessary Information and Sufficient Detail to Allow Evaluation by the Consultant and the University and, if the University Determines the Alternate is Acceptable, an Addendum Will Be Issued Allowing the Change and Advising All Bidders of the Option. If No Addendum is Issued to Allow the Requested Change, the Bidder Shall Assume the Request is Not Approved and Shall Prepare the Bid on That Basis. 16. Post Bid Meeting the Apparent Low Bidder Will Be Requested to Meet With the Construction Manager to Review the Bid and Scope of Services. The Time and Place of This Meeting Will Be Announced After the Bid Opening.
Final Planning
Educational
$558,777.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
15
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2023
June 3, 2024
1210 University Dr, Lexington, KY
Related To This Project
Lexington, KY
Bid Date: Nov 22 2023
Lexington, KY
Bid Date: Jan 30 2024
Lexington, KY
Bid Date: Dec 13 2023
Lexington, KY
Bid Date: Nov 16 2023
Lexington, KY
--
Lexington, KY
Bid Date: Nov 20 2023
Lexington, KY
Bid Date: Dec 12 2023
Lexington, KY
Bid Date: Nov 22 2023
Lexington, KY
Bid Date: Nov 28 2023
Lexington, KY
Bid Date: Oct 26 2023
Lexington, KY
Bid Date: Nov 07 2023
Lexington, KY
--
Lexington, KY
Bid Date: Nov 13 2023
Lexington, KY
Bid Date: Oct 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.