BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2023 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a civil project in Georgetown, Delaware. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of November 28, 2023, the project has not been awarded. A timeline for award has not been confirmed. Pre-bid Meeting: No Location: Sussex County These Improvements Are More Specifically Shown on the Location Map(S) of the Attached Plans. The improvements consist of furnishing all labor and materials for the replacement of BR 3-320 which will involve replacement of the existing corrugated metal pipe arches and concrete headwalls with a precast box culvert, and reconstruction of the approach roadway. The proposed structure will be extended outside the clear zone and pedestrian railing will be added to the new headwalls to replace the existing concrete barrier. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. Completion Time: All Work on This Contract Must Be Complete Within 90 Calendar Days. Extensions of Contract Time Due to Weather Are Specified in the Standard Specifications Section 108.7f, Weather Days. It is Estimated a Notice to Proceed is Issued Such That Work Starts on or About April 2, 2024. Questions Regarding This Project Are to Be E-mailed to the Above Address No Less Than Six Business Days Prior to the Bid Opening Date in Order to Receive a Posted Response. Please Include the Contract Number in the Subject Line. Surety Bond - Each Proposal Must Be Accompanied by a Deposit of Either Surety Bond or Security for a Sum Equal to at Least 10% of the Amount Bid. Performance-based Rating System - 29 Del.c. 6962 (C)(12)(a) Requires Deldot to Include a Performance-based Rating System for Contractors. The Performance Rating for Each Contractor Shall Be Used as a Prequalification to Bid at the Time of Bid. Refer to general Notices for Details. DEDOT - Replacement of BR 3-320 on King Street

Award

Bridges / Tunnels

$950,560.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

27

5

2

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
65
Bidding Soon
867
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2023

April 2, 2024

Project location map

King St, Georgetown, DE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.