Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Montreal, Quebec. Contact the soliciting agency for additional information.
Reference number : 1773175 Deadline for receiving complaints: 2023-11-08 Electronically transmitted submission accepted: Yes, in a single submission document Expected duration of the contract without options (in months): 6 Title : 78210_PMV_L0801.03_Doors, and frames and hardware The University of Montreal is issuing a public call for tenders with the aim of concluding a contract with a contractor for DOORS , FRAMES AND HARDWARE as part of the project to reassign the spaces of the Roger-Gaudry and Marie-Victorin pavilions located on its mountain campus (main campus), which is carried out in construction management mode. This reallocation project is part of a long-term development vision for the University, established according to its Master Plan and which constitutes the phase following the construction of the Science Complex on the Outremont site (CSSO). The new pavilions that were created there, namely the science pavilion and the teaching pavilion and the library, made it possible to free up space on the project site. The project therefore consists of transforming the spaces directly affected by the transfer of activities to the CSSO, namely the Roger-Gaudry (PRG - East and West) and Marie-Victorin (PMV) pavilions, in order to reassign them and use them for other purposes. The project thus provides for the renovation, upgrading and adaptation of these buildings whose current configuration does not meet the functional needs of the units that will move there. This reallocation of spaces will also be an opportunity to implement a unit grouping strategy to correct the dispersion of academic units across several sites. The contractor-lot is informed of the following particularities concerning the Reallocation project: The work of the Reallocation project will take place in existing buildings whose physical condition, age, dilapidation and non-compliance with various codes and standards in force have a high level of complexity; The buildings present a heritage and iconic character of the mountain site as a whole which must be respected, as well as the distinctive architectural characteristics which must maintain their integrity; The execution of the work must allow the maintenance of services in buildings occupied by research, teaching and administrative functions, particularly in terms of heating, air conditioning, ventilation, plumbing, fire protection, evacuation, access; Work of varying nature and scale will be carried out by third-party contractors concurrently with the completion of the Reallocation project in the various buildings of the University; The work of this lot consists mainly of the supply of labor, materials, equipment, materials and services necessary to carry out all the work on doors, frames and hardware as part of the redevelopment of the Marie-Pavilion. Victorin from the University of Montreal. For further details refer to the scope of work in the technical documents. The pavilion, comprising 5 floors in total, has a length of 160 meters and an area of 43,347 m2 gross excluding the boiler room (wing H), or 24,347 m2 net, according to the current gross/net ratio. The redevelopment work affects 3 floors and involves 8,857 m2.
Post-Bid
Educational
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 22, 2023
December 1, 2023
Multiple Locations, Montreal, QC
Related To This Project
Montreal, QC
Bid Date: Jan 16 2024
Montreal, QC
--
Montreal, QC
Bid Date: Nov 23 2023
Montreal, QC
Bid Date: Oct 30 2023
Montreal, QC
Bid Date: Nov 13 2023
Montreal, QC
Bid Date: Jan 22 2024
Montreal, QC
Bid Date: Nov 15 2023
Montreal, QC
Bid Date: Nov 21 2023
Montreal, QC
Bid Date: Nov 23 2023
Montreal, QC
Bid Date: Nov 09 2023
Montreal, QC
Bid Date: Nov 28 2023
Montreal, QC
Bid Date: Nov 10 2023
Montreal, QC
Bid Date: Dec 12 2023
Montreal, QC
Bid Date: Dec 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.