BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Temple, Georgia. Completed plans call for site work for a road / highway.

The City of Temple is soliciting sealed bids from qualifying paving companies for the following Subdivision streets: Webster Lake Subdivision, Arbor Landing Subdivision, and Lakeland Park Subdivision. (a) Bid bonds shall be required for all public works construction contracts with estimated bids or proposals over $100,000.00. (b) In lieu of the bid bond, the City of Temple may accept a cashier's check or a certified check in the amount of not less than 5 percent of the total amount payable by the terms of the contract payable to and for the protection of the governmental entity for which the contract is to be awarded. Webster Lake includes the following scope of work. The total linear footage of the FINAL TOPPING is 2,700 linear feet with an average width of 24 feet. There are 2 cul-de-sacs with an average radius of 40 feet. This site can be seen by reviewing plans for this subdivision, q-public, Google Earth, or through on-site observation. Full depth milling is to be done throughout 50% of this site and includes installation of Recycled Asphalt SP 19MM Binder at a minimum of 2 inches in thickness, include the milling in the cost of the 19.5MM asphalt. A 1-inch final topping of Recycled Asphalt SP 9.5MM is to be placed throughout the entire site. ALL MILLINGS MUST BE RETURNED TO THE CITY OF TEMPLE PUBLIC WORKS DEPARTMENT AT 155 MONTGOMERY STREET TEMPLE, GA 30179. For identification purposes: Webster Lake Subdivision is located at the end of Old Bremen Rd in Temple, GA. Arbor Landing includes the following scope of work. The total linear footage of the FINAL TOPPING is 1,950 linear feet with an average width of 24 feet. There are 4 cul-de-sacs with an average radius of 40 feet. This site can be seen by reviewing plans for this subdivision, q-public, Google Earth, or through on-site observation. Patching is required at various locations throughout this site and includes the installation of Recycled Asphalt SP 19MM Binder at a minimum of 2 inches in thickness, include the milling in the cost of the 19.5MM asphalt. A 1-inch final topping of Recycled Asphalt SP 9.5MM is to be placed throughout the entire site. ALL MILLINGS MUST BE RETURNED TO THE CITY OF TEMPLE PUBLIC WORKS DEPARTMENT AT 155 MONTGOMERY STREET TEMPLE, GA 30179. For identification purposes: Arbor Landing Subdivision is located off Center Point Road. Lakeland Park includes the following scope of work. Milling and patching at various locations throughout the site using Recycled Asphalt SP 19.5MM at a minimum of 2 inches in thickness, include the milling in the cost of the 19.5MM asphalt. This site can be seen by reviewing plans for this subdivision, q-public, Google Earth, or through on-site observation. ALL MILLINGS MUST BE RETURNED TO THE CITY OF TEMPLE PUBLIC WORKS DEPARTMENT AT 155 MONTGOMERY STREET TEMPLE, GA 30179. For identification purposes: Lakeland Park Subdivision is located off Bar J Road. The undersigned bidder hereby declares that he has carefully examined the information contained herein. All prices must include labor, materials, and equipment to complete the project. Factors in the City Council's selection of the company to perform this work will include the price, scope of work in repairing and then resurfacing these streets, and the timeline for completing the work. Questions should be directed to Public Works Director Josh Smith by email at, jsmith@templega.us or by phone at, 678-699-3785.

Award

Roads / Highways

$344,450.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
79
Bidding Soon
1,402
All Active Projects
594
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 28, 2023

December 28, 2023

img_map_placeholder

Multiple Locations, Temple, GA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.