BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2024 at 8:00 PM

Updated March 20, 2024

Remodeling of a mixed-use development in Los Angeles, California. Completed plans call for the remodel of a medical facility and military facility.

The bid date has been extended and there are updated drawings. This is to Remodel the Veterans Affairs Building #257 in Los Angeles CA and was originally bid off of 50% Dwgs as a Design Build project in late 2022. We (Talion Construction) have already been awarded this project by Veterans Affairs and we currently have our site super in place on the site. Since this is a Design Build Contract between the VA and Talion Construction, we have been working with our design team to develop the attached drawings which are currently @ 90%. They are getting close to completion so I want to get this up officially so we can get the final pricing and get the BUY OUTS completed. Once that is done we can make the final adjustments in cost once we have the 100% CD dwgs. ready. The plan is to start the actual work in early December 2023, and will be divided into 3 phases beginning with the West Wing of the building and then moving to the Middle and then the East Wing. If you are Bidding - Please email me back @ brian.lock@talionconstruction.com 02 41 00 - Demolition 02 41 19 - Selective Demolition 02 00 00 - Existing Conditions 03 00 00 - Concrete 08 00 00 - Openings 21 00 00 - Fire Suppression 26 00 00 - Electrical 27 00 00 - Communications 28 00 00 - Electronic Safety and Security 31 00 00 - Earthwork 32 00 00 - Exterior Improvements Your proposals are due no later than November 3, 2023 10:00 AM . Here is some of the project information. It includes, but is not limited to: This is to Remodel the Veterans Affairs Building #257 in Los Angeles CA and was originally bid off of 50% Dwgs as a Design Build project in late 2022. We (Talion Construction) have already been awarded this project by Veterans Affairs and we currently have our site super in place on the site. Since this is a Design Build Contract between the VA and Talion Construction, we have been working with our design team to develop the attached drawings which are currently @ 90%. They are getting close to completion so I want to get this up officially so we can get the final pricing and get the BUY OUTS completed. Once that is done we can make the final adjustments in cost once we have the 100% CD dwgs. ready. The plan is to start the actual work in early December 2023, and will be divided into 3 phases beginning with the West Wing of the building and then moving to the Middle and then the East Wing. Please email me back @ brian.lock@talionconstruction.com

Post-Bid

Medical

$10,000,000.00

Public - Federal

Remodeling

398

84

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
656
Active Projects
266
Bidding Soon
3,312
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

May 6, 2024

Project location map

11301 Wilshire Blvd, Los Angeles, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.