BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in San Jose, California. Completed plans call for the renovation of a municipal facility.

Reupholster Benches in Courtroom 8 at Robert F. Peckham Federal Building and Courthouse Reupholstering all ten (10) courtroom benches in Court room 8 in accordance with the attached of Work The goal of this project is reupholstering all ten (10) courtroom benches as well using movers blankets and protective materials to protect courtroom furniture and or equipment. Project : First Floor, 280 S, First Street, San Jose, CA 95113. PROJECT REQUIREMENTS General Contractor shall be responsible for verifying all measurements. All benches, as specified by the government. Contractor shall carefully and professionally move, lift, cover and/or relocate all furniture, equipment, materials, floor/wall/ceiling plates and fixtures and miscellaneous items as appropriate to of work as specified. Contractor shall be liable for any damages to aforementioned items. Contractor shall follow the conceptual new flooring layout on the attached for spacial references. Contractor shall provide and gain approval of new flooring and wall finish plans in PDF format from the Contracting Officer prior to ordering materials. Contractor shall perform all work herein without impeding current operations of the surrounding personnel. of work will be done in (one (1) phase. All specifications provided herein shall only be substituted if approved by the Contracting Officer. If required for city permitting or building management purposes, Contractor shall provide all applicable design services including applicable structural, demo, install, electrical, low voltage, fire protection/annunciation, flooring finish and mechanical plan sheets for review by the Government. Government acceptance is required prior to starting construction. In addition to the GSA of Work (SOW) Contractor shall comply with the attached floorplan Exhibit A, this document is conceptual and all dimensions shall be validated by the Contractor prior to proposal. All areas involved in this of work shall be cleaned on a daily basis and include an in-depth, thorough clean for a proper reveal and turnover to the Government. SUBMISSION OF QUESTIONS/ RFIs: questions must be submitted by November 9, 2023. Submit all questions to: David White (david2.white@gsa.gov), Ignacio Lopez (ignacio.lopez@gsa.gov) and Michaelene Kyler (michaelene.kyler@gsa.gov). CONTRACT AWARD DATE: estimated to be on or about December 15th, 2023 The period of is 180 calendar days from the Notice to Proceed

Post-Bid

Municipal

$13,836.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
286
Active Projects
130
Bidding Soon
2,619
All Active Projects
1,091
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 1, 2023

December 15, 2023

img_map_placeholder

280 S 1st St, San Jose, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.