BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Deforest, Wisconsin. Completed plans call for site work for a playground / park / athletic field.

The Village of Windsor will receive sealed bids to design, procure and install playground equipment at Millstone Heights Park located at 3842 Sunny Wood Drive, DeForest, WI. Date of substantial completion for the above work is June 30, 2024. The work shall consist of the design, procurement and installation of all materials necessary to construct a playground including border and fall zone material, as set forth in the Bid Specifications dated October 18, 2023. The maximum dollar amount allocated to the project is $65,000.00. Any bid more than $65,000.00 will be automatically rejected. The Village of Windsor reserves the right to reject any or all bids, to waive any technicalities and informalities therein, and accept any bid which it deems advantageous to the Village. No bid shall be withdrawn after the opening of bids without the consent of the Village of Windsor for a period of 60 days after the scheduled time of closing bids. This is an existing playground site. (see attached picture of site) The site currently has an Ages 1- 5 play structure and swing set. Previous Ages 5-12 play structure has been removed. The proposed play structure should be in primary colors to match existing 1-5 age structure. A 42 x 42 foot play area remains with some fall zone material. New border and additional fall zone material for the playground area are part of the scope of the project. There is some room to extend the play area beyond 42x42 if needed. Scope of Work includes but not limited to: o Minimum 42' x 42' area o Minimum 5" posts o 1 or more slide elements o Multi-level elements o Play activity panel(s) o Climber element - variety of climbers o 1 bench with back o Black plastic borders to surround Perimeter of Fall Zone with one entrance ramp o Fall Zone Material - Engineered Wood Fiber

Award

Playgrounds / Parks / Athletic Fields

$64,868.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
49
Bidding Soon
1,017
All Active Projects
456
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2023

March 27, 2024

img_map_placeholder

3842 Sunny Wood Dr, Deforest, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.