BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 27, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a mixed-use development in Tigard, Oregon. Completed plans call for site work for a educational facility; and water / sewer project.

Tigard-Tualatin School District (TTSD) No. 23J is requesting proposals for the Fowler Middle School Sewer Project. Question Deadline 11/07/2023 Requests for clarification or protests must be addressed and filed by mail or email as follows: RE: RFP -- Contractor Services - Fowler Sewer Project Email: schristensen_ext@ttsd.k12.or.us Regular Mail: Shawn Christensen, Project Manager Tigard-Tualatin School District 6960 SW Sandburg Street Tigard, OR 97223 For further information or questions, contact Shawn Christensen, schristensen_ext@ttsd.k12.or.us. Project scope includes CSI Divisions: 01, 02, 03, 05, 06, 07, 08, 09, 10, 12, 22, 31, 32, 33. The Tigard-Tualatin School District No. 23J reserves the right to reject any or all qualifications that are not in compliance with all prescribed requirements. The Work of the Project is defined by the Contract Documents and consists largely of interior sewer replacement and repairs isolated in a section of Fowler Middle School. The Project includes abatement, plumbing, flooring and casework as well as some exterior window replacement. B. The Work shall include all supplies, tools, equipment, scaffolding, transportation, utilities, service, superintendence, labor, and the furnishing of all materials, items, and accessories needed for the Project. 1. All on-site work, including demolition, installation, and final cleaning is required to be completed outside of school hours (7:30 am - 4 pm) and shall be completed on regular (not overtime hours). Contractor is to coordinate work to accommodate the continuous operation of the adjacent streets and utilities, without interruption or hindrance. 2. The Contractor shall provide for all scheduling, coordination, cutting and patching and all other items required by the Contract Documents to complete the Work ZONE 1 13,912 SF ZONE 2A 19,270 SF YES ZONE 2B 14,236 SF YES ZONE 3 11,134 SF ZONE 4 (TYPE IV HT) 17,723 SF YES ZONE 5 7,592 SF ZONE 6 (TYPE IV HT) 13,486 SF ZONE 7A 8,104 SF ZONE 7B 8,104 SF ZONE 8 11,744 S

Award

Water / Sewer

$1,920,936.00

Public - City

Site Work

33

26

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
88
Bidding Soon
1,078
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2023

June 17, 2024

Project location map

10865 SW Walnut St, Tigard, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.