Demolition and site work for an educational facility in Murrysville, Pennsylvania. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

As of January 4, 2024, project was awarded to the following contractors. For General Construction awarded to Ritenour and Sons Construction Co., with $342,000.00 and Asbestos to Trifecta Team with $131,224.00. Total awarded amount is $473,224.00. All work shall be conducted in accordance with the Scheduling Requirements of the Work as hereafter specified. The Contractors shall be responsible for the means, methods and sequences to implement the specified schedule, Bids shall be entered in the proper spaces of Proposal for Contract Work included: Throughout the construction period, maintain the buildings and site in a standard of cleanliness as described in this section. Each bid must be accompanied by a Bid Bond, Cashier's Check, Trust Company Treasurer's Check or Certified Check made payable to the Franklin Regional School District in an amount of not less than five percent (5%) of the proposal (including Base Bid and all Add Alternate Bids) Such Bid Bond or Check shall be submitted with the understanding that it shall guarantee that the Bidder's Bid will not be withdrawn for a period of at least sixty (60) days after the scheduled closing time for receipt of bids; that if the Bid is accepted, the Bidder will execute the Form of Agreement, as provided by the Owner, with all blanks appropriately filled and will submit the required 100% Performance and Labor and Material Bonds (submitted on A.I.A. Document A312) and 100% Maintenance Bond as specified in Section 007216, Article 11; and that in the event of withdrawal of said Bid within said period, or the failure to enter into said Agreement and submit said Bonds within ten days after the Bidder has received notice of the acceptance of the Bid, the Bidder shall be liable to the above mentioned Owner for the full amount of such Bond or Check as representing the damage to the Owner on account of the default of the Bidder in any particular hereof. The Bid Bond or Check of all Bidders whose Bids are not accepted will be returned within ten calendar days after the scheduled bid opening date. 1. Contractor's withdrawal of Bid: a. A bidder may only withdraw a bid if there is an honest and good-faith mistake (which must be supported by evidence) in the calculation of the bid price. A bidder has two business days from bid opening to withdraw a bid. b. The Owner reserves the right to accept or decline the Contractor's Withdrawal of Bid Request and reserves the right to retain the bid bond. c. A bidder who withdraws a bid will not be permitted to bid on the project a second time (should it be rebid) or provide any work or materials to the project. d. If the Owner chooses to rebid the project, the bid bond of the withdrawing bidder will be forfeited to the Owner to supplement the rebid costs

Award

Educational

$473,224.00

Public - City

Demolition, Site Work

29

11

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
139
Bidding Soon
1,616
All Active Projects
748
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 15, 2023

December 15, 2023

img_map_placeholder

3210 School Rd, Murrysville, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.