BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 20, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Moody AFB, Georgia. Completed plans call for site work for a water / sewer project.

Moody AFB Watermain Interconnection The proposed project includes the installation of +-1,950 LF of new 12 watermain, +-220 LF of jack and bored 18 steel casing, and a +-300 SF building enclosure for valves and a water meter. The contract time is 180 calendar days. A 5% bid bond is required. All Bidders must be licensed underground utility contractors in the State of Georgia. All follow-up information such as the pre-bid meeting sign-in sheet and bid tabulations will be available on the Lowndes County website.

Award

Water / Sewer

$886,352.00

Public - County

Site Work

23

11

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
45
Bidding Soon
573
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2023

January 1, 2024

Project location map

Multiple Locations, Moody AFB, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.