BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Lakeland, Florida. Working plans call for site work for a water / sewer project.

The of work for this project shall include the design, permitting, construction, and testing of one (1) circular, 135-foot inside diameter, 3.0 MG (nominal volume; 2.8 MG useable) wire wrapped pre-stressed concrete potable water storage tank with a galvanized steel diaphragm including vent(s), hatch, manway, guardrails, aluminum exterior ladder, FRP interior ladder, gravity ventilator, precast overflow(s), and other accessories as described herein. Install all piping, fittings, and appurtenances within the perimeter of the tank and extending to connect to the influent and effluent pipe connection points, as shown in the supplied as-built drawings. Connection points and pipe elevations shall be field verified the Design-Build Firm. The complete Design and Construction Criteria sets forth requirements regarding survey, design, and construction requirements relative to project management, scheduling, and coordination with other agencies and entities such as state and local government, utilities and environmental permitting agencies, and the public. Deadline 11/15/2023 at 4:00 PM ET. Any and all questions or requests for information relating to this RFQ must be directed, in writing, to the County's Designated Point of Contact provided below: Designated Point of Contact: Bryan Matus, Sr. Procurement Coordinator SJC Purchasing Division 500 San Sebastian View St. Augustine, FL 32084 Email: bmatus@sjcfl.us In the event the Designated Point of Contact provided above is absent or otherwise unavailable for more 4 than three (3) business days during the solicitation process, questions or inquiries may be directed to Diana Fye, Senior Procurement Coordinator at dfye@sjcfl.us. Issue Notice to Proceed 10 days from Contract Execution Substantial Completion 365 days from Notice to Proceed Final Completion 30 days from Substantial Completion The County reserves the right to accept or reject any or all Qualifications, waive minor formalities and irregularities, and to award to the Respondent that serves the best interest of the County. If this Cost Proposal is not accepted within ninety (90) consecutive calendar days of the submittal deadline for Qualifications, or if the Undersigned delivers the executed Contract, all required documents and the required , as provided in the RFQ Documents, the Security shall be returned to the Respondent within seven (7) business days of issuance of Notice to Proceed.

Final Planning

Water / Sewer

$2,800,000.00

Public - County

Site Work

5

6

8

7

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
58
Bidding Soon
1,368
All Active Projects
547
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2023

April 1, 2024

img_map_placeholder

8950 N Campbell Rd, Lakeland, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.