BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Santa Barbara, California. Contact the soliciting agency for additional information.

Provide Airport Pavement Management Program Services for the Santa Barbara Airport. Deadline to submit written questions via PlanetBids October 6, 2023. The City of Santa Barbara (City) is requesting Statements of Qualifications from experienced engineering firms to provide professional services for updating the Santa Barbara Airport (SBA) Pavement Management Program (PMP). The scope of work is limited to airfield pavements within the SBA air operations area (AOA). The scope of work is anticipated to be partially funded with Federal Aviation Administration (FAA) Airport Improvement Program (AIP) grant funds and all contract provisions applicable to FAA AIP funded projects will apply. Primary goals of the project include updated pavement condition index of airfield pavements, pavement condition ratings, roughness and skid resistance of runway pavements, and a capital improvement plan. Liquidated Damages. In the event of any violation of the clause set forth in paragraph (1) of this clause, the Contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1) of this clause, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1) of this clause. The method of Contractor Selection has not been Determined at this time. Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Online Q& Yes If you have any questions regarding this RFQ, please feel free to contact Brad Klinzing, Supervising Engineer, at BKlinzing@SantaBarbaraCA.gov or (805) 692-6020.

Conceptual

Transportation Terminals

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
22
Bidding Soon
357
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2024

img_map_placeholder

500 James Fowler Rd, Santa Barbara, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.