BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a mixed-use development in Clancy, Montana. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

Forest Park water system Est. Completion Date: May 31, 2024 The Forest Park Water System Improvement Project includes replacement of Approximately 570 liner feet of water main and associated valves, appurtenances, reconnection of all existing services, and gravel and asphalt surface restoration. The project is scheduled for completion by May 31, 2024. The water system has the capacity of storing approximately 100,000 gallons of water at the top of the subdivision, which gravity feeds the community. Water usage in the month of April typically averages 25,000-30,000 gallons per day; while usage in May typically averages 40,000-60,000 gallons per day. Proper planning, coordination, and timing will be required by the Contractor of this project so that water service disruptions during this project are minimized. This will require communication and careful planning with the Owner and the Owners representatives. Portions of this project will be constructed on easements that are located on private property. Proper planning, coordination, and timing with landowners and the Owner will be required to ensure cooperation. The Work hours will be from 8am to 5pm, Monday through Friday. Please include in your Bid a schedule that shows your ability to perform and complete the work by or before the completion date along with a work description the describes the Contractors approach and understanding of the project; including proposed equipment, manpower, and approach to minimize service disruptions to residents. Traffic Control will also be required, and the Contractor is responsible for providing and scheduling all necessary traffic control to safely complete the work. Deadline for questions is 5:00 PM (local time) on November 16th, 2023 (Thursday).

Award

Water / Sewer

$145,000.00

Public - City

Paving, Site Work

4

9

2

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
179
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2023

December 21, 2023

Project location map

Beaver Ln & Forest Park Dr, Clancy, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.