BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2023 at 7:00 PM

Updated January 27, 2024

Renovation of an educational facility in Omaha, Nebraska. Completed plans call for the renovation of a educational facility.

**As of November 28, 2023, this project has not yet been awarded. The project is expected to be awarded on December 4, 2023.** The construction project generally described as the Millard North High School HVAC Upgrade Phase Any questions concerning clarification of this bid should be directed to: Andrew Pullmann Morrissey Engineering 4940 North 118th Street Omaha, Nebraska 68164 Phone: (402) 491-4144 apullmann@morrisseyengineering.com A. The entire project is within Millard North High School (MSHS) campus, 144th and Pacific Streets. The project consists of replacement of existing fan powered terminal units, replacement of existing rooftop units, modifications to existing and associated general construction, temperature controls, and electrical work. B. Work under this contract includes all material, labor, tools, expendable equipment, utility and transportation services, and all incidental items necessary to perform and complete, in a workmanlike manner, the work required for the construction of the Millard North HVAC Upgrade Phase I project. C. Renovations will take place during staff and student summer vacation but various areas of the facility will be occupied by summer school activities. Contractors and MNHS staff will work closely to isolate areas of work. D. Work in the facility shall be allowed during normal working hours throughout the project, however, the contractor must provide, at all times, for clear exit paths, proper lighting, and fire/smoke protection (subject to approval of all authorities having jurisdiction) and protection against any and all fumes and odors caused by construction activities. The contractor shall halt or modify any activities the Owner determines to be disruptive in any manner to their continued use of the building. E. In addition to any temporary walls shown in these documents, temporary walls may be required in areas of construction depending on the type of work being performed in certain areas. See Division 01 50 00-Temporary Facilities for additional requirements.

Award

Educational

$1,033,300.00

Public - City

Renovation

17

8

16

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
94
Bidding Soon
968
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2023

May 27, 2024

Project location map

1010 S 144th St, Omaha, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.