Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2025 at 8:00 PM
Updated August 19, 2025
Site work and paving for a road / highway in Moreno Valley, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of May 08, 2025 This project has been awarded to California Professional Engineering, Inc., with the awarded amount of $432,851.50.** Each Bid shall be accompanied by cash, a certified or cashiers check, or Bid Bond secured from a surety company satisfactory to the City, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to the City of Moreno Valley to guarantee the Bidder will enter into a Contract with the City. The Contractor shall complete all preconstruction requirements, ordering of materials, and construction of the Project within the Contract Time of Ninety (90) Working Days for the Base Bid only. Working Days for Base Bid after the date of commencement specified in the Notice to Proceed to Fulfill Preconstruction Requirements issued by the City. See the Agreement for details regarding the initial Notice to Proceed to Fulfill Preconstruction Requirements and Notice to Proceed with Order of Materials and subsequent Notice to Proceed with Construction. If there are no additive alternate bids then remove Base Bid. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. The City shall award the contract for the Project to the lowest responsive, responsible Bidder as determined by the City from the Base Bid alone. The City reserves the right to reject any or all Bids or to waive any irregularities or informalities in any Bids or in the bidding process. Question Submission Deadline:March 27, 2025, 2:00pm The engineers estimate is between $300-$500K. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractorshall furnish, to the satisfaction of the Engineer, all labor, materials, tools, equipment, and incidentals, unless otherwise specified, to construct and complete the Work in compliance with the Contract Documents. This project aims to improve the curb radius at the southeast corner of Heacock Street and Cactus Avenue. The modifications will accommodate better traffic flow and improve pedestrian safety. The work will involve changes to the curb ramp, traffic signal, roadway stripping, and associated conduits. The project will need to be coordinated with the City of Moreno Valley's IT group in order to install fiber lines in between construction phases in order to prevent any fiber outages. The project will focus on installing conduits and pull boxes first then allowing the City of Moreno Valleys IT group to disconnect and reconnect existing fiber lines over a weekend, once this is completed then the rest of the improvements may commence
Award
Roads / Highways
$432,852.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
July 1, 2025
Heacock St & Cactus Ave, Moreno Valley, CA
Related To This Project
Moreno Valley, CA
Bid Date: May 20 2025
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
