BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Columbia, South Carolina. Conceptual plans call for site work for a water / sewer project.

DESCRIPTION DISCLAIMER: "THIS SOURCES SOUGHT IS FOR INFORMATIONAL PURPOSES ONLY TO GAIN KNOWLEDGE OF POTENTIAL SMALL BUSINESS INTEREST. THIS IS NOT A "REQUEST FOR QUOTE (RFQ)" TO BE SUBMITTED. IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT. RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT. NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY. RESPONSES WILL NOT BE RETURNED TO THE RESPONDER. NOT RESPONDING TO THIS NOTICE DOES NOT PRECLUDE PARTICIPATION IN ANY FUTURE REQUEST FOR QUOTE (RFQ) OR REQUEST FOR PROPOSAL (RFP), IF ANY ISSUED. IF A SOLICITATION IS RELEASED, IT WILL BE SYNOPSIZED ON THE GOVERNMENT-WIDE POINT OF ENTRY (GPE). THE ANTICIPTED PROCUREMENT WILL BE FIRM FIXED PRICE SERVICE CONTRACT. IT IS THE RESPONSIBILITY OF POTENTIAL OFFERORS TO MONITOR THE GPE FOR ADDITIONAL INFORMMATION PERTAINING TO THIS REQUIREMENT." NOTE: IF YOU ARE NOT A SMALL BUSINESS, DO NOT SUBMIT A RESPONSE TO THIS SYNOPSIS. The loading dock at Fort Jackson Training Support Center, Ft Jackson, SC warehouse needs the safety barriers replaced. These barriers must be able to stop a 10K Forklift, pallet jacks and employees from falling off the dock. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to remove and replace existing safety barriers and netting. Salient Characteristics: - 62 in. Barrier Guards - 58 in. high bright red PVC coated fiberglass mesh w/ 4 bright yellow heavy duty restraint straps that pulls from left to right - MUST MEET guardrail requirements under OSHA 1910.29 (Walking working surfaces) - 3 ft adjustable straps - Snap hooks - Cam buckles - Wall brackets for installation

Conceptual

Water / Sewer

$100,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
120
Bidding Soon
1,444
All Active Projects
635
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 7, 2024

img_map_placeholder

1558 Washington Rd, Columbia, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.